Sto ge Shed MA ie Ft A Patent Ft it te si 416.091 its Cust e e i e ti e 00 3 u t uti R M i te e F ee t ge R T T R S eds. A A 1 MB A A 2 X te F A i X X s ed it e te si use t is u e its Building A ro imate i e torage Area Feet . Ft. Cu. Ft. 8 20 105 1 2 212 imensions ( ne terior tension) : imension Interior Roof d e to Roof d e idt inc 94 3 8 imension all to e t eig t inc inc inc inc 31 73 92 1 4 31 63 3 8 inc idt e t all eig t .
urama torage ed imited ifteen ear arranty U.S. Polymer Inc. ill send a re lacement art free of c ar e, in t e event of material defects and or or mans i for a eriod of fifteen years from t e date of rc ase. is arranty is e tended only to t e ori inal rc aser. A rc ase recei t or ot er roof of date of ori inal rc ase ill be re ired before arranty service is rendered. In no event s all e ay t e cost of floorin , labor, installation or any ot er costs related t ereto.
Parts ist ACC C C C R R R S RI T T C R R T R R T (C TT TT T R R RS RS RS RS RS RS RS RS RS RS RS S S R R RRS R S R R T R R T R R T T R S T R T R T R R T R SS RS R STR RS R STR RS R STR RS R STR RS R SRT RS R STR RS R STR TT TT T R R TT T S R R R S RT ill RC M C R RC M (CCB) MI C M (CMB) R R F TR CT R (R 1XB 3B B B) (CB 1B 2B 3B 3XB 4B) (M ) S T T S R S T T S R S T T S R C annels (B1 B)(B1RB) (B21) (B22) (B2B) S S S R F TR CT R (R B) R T PP R ( ) RT A RT
8’ x 6’ Exploded View RRS RRS RP RP RP RP FPLB FPRB RS5B RS10B RS2B RS2B RS4XB RS11B RS4XB RS5B RS5 RS5 RS2B RS10B RS1XB RS1XB MJ DSH RS9B RS8B FPRB FPLB CMB MJ RS2B RS12B RS3B CMB RS3B CB3B CMB CCB CB3XB CB2B B22 CCB B2B B21 CCB CB1B CMB B2B CB2B CCB B1LB B1RB CB1B CB4B CB4B CDRB CDLB FSP FSP DR DL
ne tension Parts ist C C T TR RS S RS RS RS RS RS RS RS S R RRS T S T S RS RS RS RS RS RS RS S S R R T R T T R R STR T R S RT R STR T R R STR T R R STR T R R STR T R S RT S R STR T R S RT R STR T R S RT R MI (FMC) RT C M FITTI R F TR CT R (R 3 B) (CB3 B) R (R F TR CT R B) (R B) (R 13B) MI M R F PP RT (R 4B) (R 11B) (R 12B) I PP RT (R 14B) RI C C TT S R R R R S S T T S R S S R T T F PI (PI ) (CMB) C annels ( XT ) ( XTR) A ACC C R A FP IT R (PP )
Exploded View with One Extension RS12B RS7B RS13B RS3SB RS13B RS6B RS4B RS13B RS13B RS3SB RS4B RS11B RS13B CMB CB3LB CMB EXTR CB3LB EXTL
A. Foundation & Base Frame PART : Asse ront left 1 ront ri t 1R ac 21 ac 22 Side 2 16mm Scre s S1 Parts needed For ac tension: 1 tn. U c annel left 1 tn. U c annel ri t R 6 Dia. 4.2 16mm Scre s S1 1. Use ress re treated ood st ds 2 4 5 10cm to b ild a fo ndation str ct re t at as an o tside dimension of 65 96 1651mm 2438.4mm . 1a. Use ress re treated ood st ds 2 4 5 10cm to b ild a fo ndation str ct re t at as an o tside dimension of 32 96 812.8mm 2438.4mm for eac e tension. ill need.
4. Usin a car enters s are, line all corners. Sec re base to ood fo ndation sin 1) scre s B22 Concrete foundation 4b. S ed or s ed fo ndation s o ld be laced on concrete footin by se of anc or bolt and n t. Usin a car enters s are, line corners. Ali n C annel base mar t e concrete t ro t e oles in t e base and drill concrete it 1 2 dia. 12.5mm concrete bit to acce t anc or bolts to a 1 3 4 44mm de t . Re lace base and sec re it 1 4 1 1 2 M6 40mm anc or bolts. Anc or bolt for asic S ed - 22 os.
2. Insert t e front side anel (F P ) into t e roove of column (C RB). Start at t e bottom of t e anel at an an le t en s into lace. ote l a s place panels into frame at an angle on top and slide in side a s and do n ard for eas insertion. C F F ote ake sure panels are right side up ith panel shingles facing do n. Check the stamped label on top. of all panels. C F C B B1 B Inside 3. Slide corner column (CCB) into side (F P ) anel s in t e col mn to t e side anel. CCB F CCB Inside 4.
5. o stabili e t e front anel attac t e front center band rig t (CB1B). Start it t e center band fitting. i to corner col mn (CCB) it 2 scre s. o contin e See fi res (fig.1) (fig.2) and (fig.3). 1 2 Ti 3 CB1B F CCB C B CB1B Inside CCB 1 1 C B FCB FCB CB1B 2 CB1B CCB Fig.1: Use Fig.2: Use 2 scre . i FCB to CCB . eave it loose. 6. Attac center band (CB4B) to door col mn (C RB) and base c annel (B1RB). i 1 scre . CB1B to FCB . Fig.3: Use i 1 scre . CB1B to (C RB).
7. Assemble oining su back center bands (CB3B) and (CB3XB) ort (M ). Use ( 1) scre s. it middle 1 CB3B CB3XB CB3B M M CB3XB 8. Assemble t e center bands (CB2B) s o n belo . Make 2 sets. Add one (CB3 B) for eac e tension. (CB3 B) it ( 3) scre s it n ts. ollo CB3 B 3 CB2B erla ing Met od For Center Band Roof structure (R 3B) & (R 3 B). TIP Use a hammer to align the holes.
9. or in from inside, contin e connectin t e side anels ( P ) and columns (CMB) in se ence alon (B2B) & ( XTR) base. Use 1 scre s to fi columns to base. CMB 9a. or eac e tension add one side anel ( P ) and one middle column (CMB) in e tension base U-c annel ( XTR) & ( XT ). CMB CMB 1 X B2B Inside 10. Slide corner column (CCB) into side s in t e col mn to t e side anel. anel ( P ) CCB CCB X B22 Inside 11. or in from o tside se ( 1) scre s to sec re t e col mn to bases (B22) and ( XTR).
12. Stabili e t e side anels it center bands (CB3 B) (CB2B). i t e center band fittin (FCB) to corner col mn (CCB) See Fig.1 ollo t e Fig. 2 3 4 & . CB2B CB3 B CMB CCB 1 CCB CB3 B CB2B FCB FCB CB1B CB2B 2 CCB Fig.1: Use ( 2) scre s. i (FCB) to (CCB). eave it loose. X CB1A B2B Inside Fig. 2 : Use ( 1) scre s. i (CB2B) to (FCB) and (CB1B). CMB 1 CMB CB3 B CB3 B CB2B 1 FCB CB3 B 1 CCB Fig.3: i to (CMB) it ( 1) scre . Fig.4: Use 1 scre s. i (CB3 B) to (CMB) columns. Fig.
13. Contin in se base e connectin t e bac anels and columns ence alon base (B22) and (B21). i col mns to it 1 scre s. CMB CCB CMB CMB 1 14. base. B22 B21 Back all i t e corner column (CCB) to last anel and CMB CCB CCB B21 X Inside 15. or in from o tside se ( 1) scre s to sec re t e corner col mn (CCB) to bases (B21) and ( XT ).
16. Stabili e t e side anels it center bands CB3B & CB3XB . i t e center band fitting FCB to corner column CCB see figure 1. ollo fi res 2 3, 4 and . CB3B CB3XB CCB CMB 4 1 3& 2 CB3B CB3XB B21 CCB CMB 1 B22 CB3B CMB FCB CB3XB FCB CB2B CB3B 2 CB1A Fig.1: Use ( 2) scre s. i (FCB) to (CCB). eave it loose. Fig. 2: Use ( 1) scre s. i (CB3B) to (FCB) and (CB2B). CB3B CMB 1 FCB CB3XB CBC CB3XB CCB Fig. : Use ( 1) scre s. i (CB3XB) to (FCB). Fig.
17. or in from inside, contin e connectin t e side anels ( P ) and columns (CMB) in se ence alon (B2B) & ( XT ) base. Use 1 scre s to fi columns to base. CMB CMB CMB 1 B1 B 18. Slide corner column (CCB) into side s in t e col mn to t e side anel. X B2B Inside anel ( P ) CCB CCB B2B B1 B Inside 19. or in from o tside se ( 1) scre s to sec re col mn to bases (B2B) and (B1 B).
20. Stabili e t e side anels it center bands (CB3 B) (CB2B). i t e center band fitting (FCB) to corner column (CCB). See Fig.1 ollo t e Fig. 2 3 4 & . CB3 B CB2B CCB CMB CCB 1 FCB FCB 2 CB2B CB3XB CB3 B CB3 B CB1A Fig.1: Use ( 2) scre . i (FCB) to (CCB). eave it loose. Fig.2: Use ( 1) scre s. i (CB3 B) to (FCB) and (CB3XB). X Inside B22 CMB 1 CMB FCB CB3 B CB3 B CB2B CB2B 1 1 Fig.3: Use 1 scre s. i (CB3 B) to (CMB) columns. CCB Fig.4: i to (CMB) it ( 1) scre . Fig.
21. Insert t e side anel (F P ) into t e roove of column (CCB). Start at t e bottom it anel at an an le t en s into lace. CCB F CCB F B1 B B1 B Inside 22. Slide door column (C B) into t e C annel Base (B1 B) on t e left side of t e door. ine t e re-drilled oles on (C B) Column it re-drilled oles on C annel Base (B1 B). Sec re it t o 1 scre s from inside. see blo detail . C C B C B CCB F B B1 B B1 B 1 23. Attac t e center band (CB1B) to door column corner column and center band (CB2B).
24. i t e center band (CB4B) to (C ee Fig. 1 2 and 3. B) and base (B1 B). C CCB B 1 3 CB1B CB1B CB B 1 CB1B CB B C B1 B C B B CB B CB B 1 Fig.2: Use Fig.1: Use 2 Fig.3: i t e ( P ) 1 scre . i CB4B to base (B1 B) 1 scre . i CB4B to (C B) B1 B at t e end of (CB1B) (CB4B). Inside 25. Ma e s re t e door o enin bet een t e door columns (C B) and (C RB is 1 1 4 (1 mm). is ill ens re a erfect fit for t e doors. C B oor C 1 m 114 m B enin g C.
1. Insert t e middle column fitting (FMC) into to of t e middle columns (CMB). i t e col mn to fittin s it ( 1) scre s from inside t e s ed. FMC FMC FMC FMC CMB CMB CMB FMC FMC CMB CMB FMC 1 CMB Inside Inside CMB CMB 2. Insert t e corner column fittings (FCC) into t e corner col mns (CCB). i it ( 1) scre s from o t side of t e s ed. FCC FCC CCB FCC FCC FCC CCB CCB CCB FCC CCB 1 CCB 3.
15 RS1XB RS2B RS3B RS4XB RS10B MJ RS1XB RS2B RS5B RS11B RS12B RS5B RS9B DSH RS10B RS1XB RS2B MJ RS8B RS4XB RS9B RS3B ROOF STRUCTURE EXPLODED VIEW RS2B RS1XB
16 RS3SB RS4B RS13B RS6B RS13B RS6B RS13B RS11B RS13B RS12B RS13B RS7B RS13B RS13B RS4B RS3SB ROOF STRUCTURE EXPLODED VIEW WITH ONE EXTENSION RS13B
Front roof structure assembl 4. Assemble front roof structures (R 1XB) 2nos. and middle oining su ort M ) to et er it 4 ( 1) scre s as s o n in fi . 1XB M 1XB 1XB 1 1XB 5. Assemble roof structure su ort (R B) and (R B) to (R 1XB) assembly it only 4 ( 1) scre s. U- C a e nn l en U- in C C U- a l en ne l in 1XB B e nn an en in 1 B ese oles 1XB te 1 6. Assemble roof str and (R B) ct re (R 2B) to (R it 8 ( 1) scre s.
Back roof structure assembl 7. Assemble bac roof structures (R 1XB) 2 nos. and middle oining su ort (M ) to et er it 4 ( 1) scre s . 1XB M 1XB 1XB 1 1XB 8. Assemble roof structure su and (R scre s. U- ort (R B) B) to (R 1XB) assembly it 8 ( 1) U- U- C an l ne en C an ne l e C an l ne en in nin B 1XB 1 in B ese oles 1XB te 1 9. Assemble roof structure (R 2B) to (R and (R B) it 8 ( 1) scre s.
10. Assemble (R See fig 1. 3B) & (R 3 B) it ( 1) scre s 2 sets . 2 3 1 2 3 10a. Insert degree oint (R ) into t e (R 3B) U-c annel Roof su ort. Use a ammer to s in. Use ( 1) scre s to fi . Re eat on ot er end of (R 3 B). See fi .2 and fi .3. Add one (R 3 B) for eac e tension. 3B ote 1 3 B 3B fig.1 fig.2 11. Assemble t e roof structure (R B) into (R Make 2 sets Add one (R B) for eac e tension. fig.3 B) it 6 ( 3) scre s it n ts. 3 B B 12.
13. Assemble t e roof str ct re(R B) & (R B) into roof str ct re (R 13B) it 8( 3) scre s it n ts at bot ends. Make 2 sets. ote is ste 13 a lies only from Ver 2.0 tension its. If yo ave a Ver 1.1 e tension it, t e R 13B art ill not be in t e e tension it and yo can s i t is ste . 13B B 3 13B B 14. Assemble t e roof str ct re(R B) & (R B) into roof str ct re (R 13B) it 8( 3) scre s it n ts at bot ends. Make 2 sets. ote is ste 14 a lies only from Ver 2.0 tension its. If yo ave a Ver 1.
15. Place t e assembled front roof structure into osition on to of door columns. ine re-drilled oles it door column fittings (F C ) & (F CR). Use ( 1) scre s to fi front roof structure to t e door col mns it left and ri t door fittin s. Front Inside f ed F C C F C B C 16. i t e door sto er ori ontal ( ) to t e front roof structure from inside it 8 ( 1) scre s. Position t e latc ole to face do n. e e i g i side t e s ed.
17. Place t e assembled bac roof structure into osition on to of columns (CMB). ine it column fittings (FMC). Use ( 1) scre s to fi bac roof structure to (FMC). Inside Back of re-drilled oles ed FMC FMC FMC FMC CMB CMB CMB CMB 2 ote Ma e s re front and bac assembly, t e (R 2B ) roof str ct re osition to ards inside t e s ed as s o n in Fig.1 & Fig.2 1 2B 2B 2B Fig.1 2B Fig.
18. Insert t e degree oint (R ) Assembled in to t e roof structure (R 1XB). See fi . Follow Fig. 2 and 3. ote it roof s ort RS3 RS3S 3 B After assembly ma e s re t is roof str ct re s U-C annel is ositioned do n. 3B 3 B ote otice t e U-c annel osition on roof str ct res R 1XB . 3B 3 B 3B 1XB 1 2B 2B 1 RST 2 1XB FCC 1XB CCB fig.1 CCB Fig.2 Sec re (R ) 90 de ree oint to (R 1XB) it ( 1) scre s on to of t e fo r corner col mns (CCB).
19. i t e (R 3B) & (R 3 B) to middle column fitting (FMC) it ( 1) scre s. 2 1 FMC 4 3 CMB fi .1 to 4 20. Place t e assembled roof structure (R B) & (R into osition on roof structure su orts (R B) at t e left side of t e s ed. Use ( 1) scre s to fi . ee Fig.1 & Fig.2 B) B 13B 13B B B B 2 B 21. Place t e assembled roof structure (R B) & (R B) into osition on roof structure su orts (R B) at t e ri t side of t e s ed. Use ( 1) scre s to fi . ee Fig.1 & Fig.
B 13B 13B B B B 3 B 22. Place t e assembled roof structure (R B) & (R B) into osition on roof structure su orts (R B) at t e left side of t e s ed. Use ( 1) scre s to fi . ee Fig.1 & Fig.2 B B B 23. Place t e assembled roof structure (R B) & (R B into osition on roof structure su orts (R B) at t e ri t side of t e s ed. Use ( 1) scre s to fi . ee Fig.3 & Fig.
24. Attac t e roof structures (R 4XB) to (R 3B) it ( 1) scre s. see fi . 1 2. 24a. Attac t e roof structures (R 4XB) to (R B) (R B) assembly and (R B) (R B) assembly it ( ) scre s. see fi . 3 4. XB 1 3B 3 XB B XB B 2 3B 1 B 1 XB XB B XB A B XB XB 3B B B 3B fig 1 fig 4 fig 3 fig 2 B 25. Attac t e roof structures (R 4B) one end to roof structure (R 3 B) it ( 1) scre s. see fi . 1 2. i t e ot er end to roof structure (R B) (R B) it ( 1) scre s see fi . 3.
26. Attac roof structure su ort (R 1 B) and (R 11B) to roof structures (R B) (R B) & (R B) sin ( 1 scre s. See fig.1 , fig.2 and fig.3 . Add one (R 11B) for eac e tension. 3 10B 11B 2 11B 10B 2 11B 10B 1 11B 10B ote Make sure t e ole in (R 1 B) face outward on bot side.
27. Attac t e roof structures su scre s. See fi .1 and 2. ort (R 12B) it (R B) and (R B) it ( 1) 12B ote is ste 27 a lies only from Ver 2.0 tension its. If yo ave a Ver 1.1 e tension it, t e R 12B art ill not be in t e e tension it and yo can s i t is ste .
. Roof anels Parts eeded For ac Parts eeded: 4 Roof Panels RP 2 acia Panel eft FP B 2 acia Panel Ri t FPRB 2 Rid e Cover RR 64 Roof Pl s as er PP 64 Roof Pins PI 8 Sa in S ort (R 14B) 1. Place facia rig t side. tension: 2 Roof Panels 1 Rid e Cover 16 Roof Pl s as er 16 Roof Pins 4 Sa in S ort Front RP RR PP PI (R 14B) F Fig.1 anel (FPRB) to front roof str ct re Front F 2. ine t e oles it roof str ct re and fi t e roof lugs was ers. Use a ammer r bber mallet to drive in roof in.
ote Fig.3 Fig.2 Fig. Fig. F Fig. Fig. 0 B Fig. Fig.
5. Insert t e sagging su ort (R 14B) from inside t e s ed by slidin in bet een roof structure (R ) and roof anel ntil it reac es (R 3 roof structure for eac anel. See fi .1. 6. Insert t e sagging su ort (R 14B) from inside t e s ed by slidin in bet een roof structure (R ) and roof anel ntil it to c es t e ot er roof structure. See fi .2. 1 B 1 B 3 utside iew . Inside iew oors Parts eeded: 1 Door eft 1 Door Ri t 1.Attac t e doors left and ri (C RB). fig.1 t (see fig.
1. After com letin t e assembly a ly silicone aro nd t e erimeter of t e base U-c annel. Seal t e corners, oints and base of door col mn also. Inside Base 2. After com c annel letin t e anel assembly, a ly silicone aro nd t e roof l s. is is o tional and s o ld be done for eavy rain areas if needed.
F. entilation it ACC RI C C T T T T T R R TI ATI ( C) C R TI ATI ( CP) I Po er Drill Dia 3 16 5mm drill bit Dia 1 2 12.5mm drill bit C tional ventilation its can be installed on any of t e all anels. o ever, e recomend mo ntin t em on t e to of t e s ed s bac all. 1. Place t e entilation co er ( C) as s o n in fi .1. Usin a encil, mar t e t o side ole locations. 2. n t e mar ed ole locations, drill o t t o oles sin dia. 3 16 5mm drill bit as s o n in fi .2.
ig wind area installation instructions Parts needed: Parts needed for eac e tension: C C C S C S S T T S R S S T T S R S Usin a car enter s are, line corners. Ali n base bars, mar t e concrete at t e oles in t e base and drill concrete it s itable concrete bit to acce t 1 4 1 1 2 M6 40mm anc or bolts. ty - 22 os. not rovided . Base c annel Concrete Anc or bolt & nut 2. Attac eac side anel ( P ) on t e bottom to t e U-c annel base. Usin a dia.
3. Attac eac side anel ( P ) on to to t e roof str ct re (R 1) and (R 3). Usin a dia. 3mm 1 8 drill it a o er drill, ma e t o e al distance oles on t e side anel t ro t e roof str ct re. Drive a self ta in scre ( 4) t ro t e side anel to t e roof str ct re. Re eat t is for every side anel. See blo .
PART 2: Adding Extension Kit to Existing Shed Back Front ote 1. Remove one ridge co er (RR ) from t e bac side . See t e fi re. TIP Use a drilling machine to remove the pins and plugs from the ridge cover, roof panel and facia panel. Care should be taken not to damage the panels. 2. Remove from bac See t e fi re. side left and ri t roof anels. Remove t is Rid e cover.
3. Remove t e roof lugs (PP ) and ins (PI ) from bac side facia anel and detac it from t e s ed. F F B 4. S ort t e roof structure (R B) & (R B) by sin an a ro riate s ort to avoid t e roof str ct re from colla sin . ote S u ort not incl ded. 5. Remove (R 1 B) from inside. See t e fi re.
6. Detac (R 2B) from (R from (R B). B). en detac (R B) B 2B B B B 7. Detac (R (R 2B) from (R B) t en (R B) ee fig.1 and fig.2.
1,2,3 8. Detac roof structure (R 2B) from roof structure (R 3B) from bot corners. ee fig.1. Detac 90-de ree oint (R ) from corner column fitting (FCC) from bot corners. ee fig.2. Detac (R 3B) from 90-de ree oint (R ) from bot corners. ee fig.3. 1,2,3 2B 3B RST 3B FCC CCB fig 1 9. Detac t e middle column fittings (FMC) from bac roof structure (R 1XB) assembly. See fi re. FMC CMB 10. P ll t e back roof structure assembly. See fi re.
11. Detac t e center bands (CB3XB) & (CB3B) assembly from t e bac all of t e s ed. ollo t e fi res. CCB CMB 2 3 1 4 FCB CB3B CB3XB CB2B CB3B CB1A CCB B21 Fig.1: Detac (CB3B) from B22 Inside back wall (CB2B). en detac (CB3B) (CB2B) from (FCB). CMB CMB FCB CB3B CB3XB CB3XB CB3XB CB2B CB1A CCB Fig.4: Detac (CB3) assembly from (CMB). Fig.3: Detac (CB3XB) from (CMB). Fig.2: Detac (CB3XB) from (CB2B). en detac (CB3XB) (CB2B) from (FCB). 12.
U.S. Polymers, Inc. 1057 S. Vail Ave Montebello, CA 90640, United States of America RD-2.