Foundation Manual

1
PART 1 : 8’ x 6’ Foundation Assembly
1. Assemble the channel (F01B) & (F02B) together using
4 screws. Make 2 sets.
F01B
F02B
2. Make a frame with the sub assemblies as shown below.
Make sure while assembling, the
channel position should be as
shown.
Note
Channel Position
F01B
F02B
F04B
FRONT SIDE
F02B
F01B
F04B
‘U’ CHANNEL
Note: Check all parts prior to installation.
CODE DESCRIPTION QTY
F01B FOUNDATION ‘U’ CHANNEL 2
F02B FOUNDATION ‘U’ CHANNEL 2
F03 FOUNDATION ‘L’ ANGLE 4
F04B FOUNDATION ‘U’ CHANNEL 6
F05B FOUNDATION ‘U’ CHANNEL 6
ACCESSORIES
CODE DESCRIPTION QTY
S1 DIA. 4.2 x 16mm. (5/32” x 5/8”)
SHEET METAL SCREW 64
Parts List
‘L’ ANGLE