User`s guide

Load Ribbon Continued - For All Ribbon Supply Sizes
The ribbon loading process is the same for all sizes of ribbon for Steps 6 - 12 of section
Load Ribbon Continued. Pages 7-9, Fig. 6, 7, 8, 11, 12, 13, & 14 illustrate 4.3" ribbon
supply.
6. Apply the Ribbon Supply Spindle to the Rear Hub, with the Ribbon Supply leader
dropped down.
7. Place the Ribbon Rewind Spindle with the paper core on the Front Hubs, by
inserting the left side of the Spindle first, fitting it onto the Front Spring-Loaded
Hub. Then fit the right side of spindle which has the flange onto the right Hub.
Fig. 8 Ribbon Rewind Spindle with paper core (4.3") being applied to the Front
Spring-loaded Hub
Fig. 9 Ribbon
Supply (2.5")
Spindles loaded
and aligned with
each other
Fig. 7 Ribbon Supply (4.3") Spindle inserted at
Rear Hubs
Fig. 6 Ribbon Supply (4.3") spindle being inserted at Rear Hubs
-7-