Full Product Manual

polishedpro | 2.0mm LVT
DuraDecor | P: (855) 700 - 5666 | customercare@duradecor.com | duradecor.com | revised on 02.7.23 | Page 4
General Information
Limitations
Acceptable concrete substrates must have an eective
vapor retarder that is compliant with ASTM E1745 installed
directly beneath the slab and, depending on the adhesive in
use, must be tested following the protocol of ASTM F2170
Standard Test Method for Determining Relative Humidity in
Concrete Floor Slabs Using in situ Probes or ASTM F1869
Standard Test Method for Measuring Moisture Vapor
Emission Rate of Concrete Suboor Using Anhydrous
Calcium Chloride. The optimal operating temperature for
use is between 40°F to 90°F (4°C to 32°C). Avoid prolonged
exposure to direct sunlight or other heat sources where
temperatures will exceed 90°F (32°C), as discoloration,
deformation or damage may occur.
Do not install in areas that may be subjected to sharp,
pointed objects, such as stiletto heels, cleats or spikes. Do
not allow product to be directly exposed to extreme heat
sources, such as self-cleaning ovens or other high-heat
equipment. Do not install outdoors or in areas that may be
exposed to repeated and sustained UV/IR rays, as product
may fade, discolor or experience excessive movement.
Refer to the Material Usage Guide and, if applicable, the
Wet Areas technical bulletin for a full list of acceptable
areas and information about approved areas of use. Do not
use rubber tires, casters or rubber-backed walk-o mats
directly on the ooring surface, as permanent staining may
occur.
Receiving Material & Storage
Remove all plastic and strapping from product after
delivery. Conrm that the ooring product color, style,
quantity and lot numbers are all correct. Carefully check
all materials for shipping damage and note all damage on
the bill of lading before accepting the delivery. Material
accepted with visible shipping damage that is not reported
on the bill of lading is not covered under warranty. Ensure
that the adhesive intended for installation is approved for
use with the ooring product. The oor covering, adhesive
and accessories must be stored in dry indoors conditions
between 40°F to 90°F (4°C to 32°C). Do not store outside
(even in containers) and do not stack pallets. Deliver all
materials to the installation location in its original packaging
with labels intact.
Warning
All local, state, and federal regulations must be followed;
this includes the removal of in-place asbestos ooring and
adhesive, as well as any lead-containing materials. The
Occupational Safety and Health Administration (OSHA)
has exposure limits for people exposed to respirable
crystalline silica; this requirement must be followed. Do
not use solvent or citrus-based adhesive removers. When
appropriate, follow the Resilient Floor Covering Institute’s
(RFCI) Recommended Work Practice for Removal of
Existing Floor Covering and Adhesive. Always wear safety
glasses and use respiratory protection or other safeguards
to avoid inhaling any dust. The label, installation, and
maintenance instructions along with the technical data
sheet, limited warranty and any appropriate Safety Data
Sheet (SDS) of all products must be read, understood, and
followed prior to installation. Do not leave spills unattended
- wipe up promptly, and allow the oor covering to dry
before tracking.
Documentation
Record and/or photograph the site conditions, test results,
and any corrective measures taken. All relevant pre-
installation documentation, as well original product invoices
and associated shop drawings or project information,
should be stored for the entire warranty period.
Site Conditions & Acclimation
The area must be fully enclosed and weathertight. During
the installation, any direct sunlight should be blocked using
window treatments or other protection. Use permanent
or temporary HVAC system to control the site conditions.
The temperature for the installation must match the
temperature when the product will be in use (in-service
temperature) and be constant (± 5°F). In addition, ambient
temperatures must be between 60°F (16°C) and 80°F (27°C)
for 48-hours before, during and after the installation.
The ambient relative humidity must be between 35% and
65% and 10°F above dew point (dew point calculators
are available on the internet), or adhesive working and/or
curing times will be severely aected. For any project that
does not meet these requirements, please contact the
technical department before installation.
Flooring acclimation is not required when the Receiving
Material & Storage requirements and the Site Conditions &
Acclimation requirements are both met. If these conditions
cannot be met, installation cannot proceed until the
ambient temperature and humidity conditions are within
the acceptable range and the ooring material is within
the acceptable ambient temperature range (± 2°F) when
measured with an infrared (IR) thermometer.