Installation Guide
DO NOT CUT!
through flashing
or apron.
A
B
A
B
A
B
Copyright ©2012 E. I. du Pont de Nemours and Company. All Rights Reserved. Rev. 2/12  9
DuPont
™
 Tyvek
®
 Water-Resistive and Air Barriers Installation Guidelines
DuPont
™
 Flashing Systems Integration 
If windows and doors have not been installed reference the DuPont
™
 Flashing Systems 
Installation Guidelines, Installation Instructions for Windows and Doors AFTER Water-
Resistive Barrier (WRB) is Installed to prepare the rough opening. 
Ifwindowsanddoorsarealreadyinstalledandashed,thenfollowtheselast2
integration steps to tie the DuPont
™
 Tyvek
®
WRBintotheashing.
STEP 1
A. Verify that the DuPont
™
 Tyvek
®
 WRB is properly shingled with the bottom of the 
apron.
B. Cut as shown to expose window and apron. DO NOT CUT THROUGH FLASHING 
OR APRON.
STEP 2
A.  Tape all seams as shown. DO NOT TAPE at bottom of window.
B.  At the head, continuous tape seams as shown with DuPont
™
 Tyvek
®
 Tape. Skip-taping 
at the head is acceptable if an air barrier is not required or if additional drainage is 
desired.










