Instructions / Assembly

Using the DuoDeck Bracket to Install Palruf® Corrugated PVC Panels
for UnderDeck Applications (General Overview)
DuoDeck
PALRUF
UNDERDECK BRACKET
®
Tools Needed
Screwgun, 1/4" socket, tape measure, line
level and string, circular saw or tin snips.
Materials Needed
1" Woodtite fasteners, 2x2 purlins (wood or
metal), Palruf® Corrugated PVC panels,
DuoDeck Underdeck Brackets.
Before You Start
DETERMINE BRACKET ORIENTATION
Bracket Installation
ESTABLISH HIGH END OF DRAINAGE SLOPE
Begin at rear of deck with outermost joists.
Allow space for a 2x2 to slide inside bracket.
Secure with four 1" Woodtite fasteners per
bracket.
Use a string level to install bracket on opposite,
outermost joist at the same level.
PALRAM AMERICAS, INC. • 9735 Commerce Circle, Kutztown, PA, 19530
(800) 999-9459 • www.palramamericas.com
Front
Rear
H
2"
B
D
1/4" pitch in 4'
Joist
D
A
A
E
E
C
C
F
F
F
F
G
G
G
G
View shown from
underneath deck.
PurlinPurlin
G
H
FEDCBA
G
H
FEDCBA
G
H
FEDCBA
…then bracket slips
over joist.
Joist
DuoDeck
Bracket
Joists
Palruf
Panel
Joists
Palruf
Panel
If Palruf panels run
perpindicular to joists…
…then bracket is
fastened to face of joist.
If Palruf panels run
parallel to joists…
Joist
DuoDeck
Bracket
ESTABLISH LOW END OF DRAINAGE SLOPE
Calculate correct slope and establish position
of low-end bracket (min. 1/4" in 4' slope).
Install brackets at front of deck on
outermost joists.
Complete installation of two outermost
rows of brackets by tying a string line
between the front and rear brackets. Use
taught stringline as a guide to install
brackets every 32" max. (or every
24" if joist spacing is 24").
Complete installation of remaining
brackets by tying a string line
between the rst sets of brackets
on left and right. Use taught stringline
as a guide to install brackets
every 32" max. (or every 24" if joist
spacing is 24"). Repeat for each
row of brackets.
Slide 2x2’s through inside of each
row of brackets. Secure with two
1" Woodtite fasteners per bracket.
RESULT: You’ll see even level rows of 2x2s
every 32" (or 24") which gradually step
down in height for desired drainage slope.
Panel Installation
Orient panels label side down
(outermost corrugation up).
Secure panels with 1" Woodtite fasteners
every other corrugation where corrugation
touches 2x2 purlin.
Overlap panels by one corrugation.
(26" panels overlap to provide 24"
net coverage per panel.)
Panel runs longer that 12' can be achieved
by overlapping panels end-to-end, with at
least 8" overlap (overlap must occur at purlin).
Finishing Options
Overlap last panel more than one corrugation
or trim with tin shears/circular saw to t.
Trimcoil and/or standard guttering system
may be installed for a more nished eect.
G
H
FEDCBA
G
H
FEDCBA
G
H
FEDCBA
G
H
FEDCBA
Looking to add a roof above your deck to provide shelter against
weather and the sun? Use SUNTUF® Corrugated Polycarbonate!
Always consult and follow local building codes and ordinances. DuoDeck, Palruf, Suntuf are trademarks of Palram. Form #206 Rev. 2/13/2009