Use and Care Manual
FIG. 4
FIG. 5
www.themdsports.com
NET320_197D
4
VOLLEYBALL& BADMINTON SET
ASSEMBLY INSTRUCTIONS
MODEL
: NET320_197D
4. NET SET UP
Stretch the assembled Net and poles across the playing area until the Net is taut. Press the Pole Anchors
into the ground with the poles touching the ground. Slip the poles onto the anchors. Holding the poles in the
vertical position, press the Guide Rope stakes into the ground at a 45ยบ angle, 3 feet to 5 feet from the pole and
3 feet to 5 feet apart. Make sure that the hooks on the stakes are facing away from the poles.
See FIG. 4 and 5.
5. BOTTOM GUIDE ROPE SET UP
Make the loops on the Bottom Guide Rope tension clips large enough to slip over the stakes already in the
ground. Make sure that the Guide Rope loops are placed under the stake hooks as shown in FIG. 5.
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
3 feet - 5 feet
3 feet - 5 feet
Top guide
rope
Bottom guide rope
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
TIP: After the net is assembled, you can adjust the
pole tension by sliding the tension clips up or down
along the guide ropes.
Loop
Top guide rope
Bottom guide rope
Tension Clip
Ground
Stake
Hook
Ground
Stakes