Instructions / Assembly
www.factorybuysdirect.com
200200-01C12
INSTALLATION
BUILT-IN FIREPLACE INSTALLATION
Figure 8 - Rough Opening for Wall 
Installation
Figure 6 - Clearance to Combustibles
Figure 7 - Fireplace Clearances
 WARNING: Do not allow any 
combustible materials to overlap 
the rebox front.
 WARNING: Do not allow 
combustible or noncombustible 
materials to cover any necessary 
openings like louvered slots.
 WARNING: Never modify or 
cover the louvered slots on the 
front of the rebox.
Built-in  installation  of  this  replace  involves 
installing replace into a framed-in enclosure. 
This  makes  the  front  of  the  replace  ush 
with wall. If installing a built-in mantel above 
the replace, you must follow the clearances 
shown in Figure 6.
NOTICE: Surface temperatures 
of adjacent walls and mantels be-
come hot during operation. Walls 
and mantels above the replace 
may  become  hot  to  the  touch. 
If installed properly, these tem-
peratures meet the requirement 
of the national product standard. 
Follow all minimum clearances 
shown in this manual (see Figure 
4, page 9 and Figure 7).
1.  Frame in rough opening. Use dimensions 
shown in Figure 8 for the rough opening. 
If  installing  in  a  corner,  use  dimensions 
shown in Figure 9 (page 13) for the rough 
opening. The height is 19", which is the 
same as the wall opening above.
2.  Carefully  set  replace  in  front  of  rough 
opening with back of replace inside wall 
opening.
1/4" Clearance to Facia
3/8" Clearance to Sides, Back and Top
15 
5
/
8
"
16"
28"
5"
4"
6"
8"
10"
12"
To
Ceiling
Hood Top
Fireplace
Safe Zone
12"
9"
6"
3"
1 
1
/
2
"
1 
3
/
4
"
Slope
Factor
19 
3
/
5
"
26 
1
/
8
"
11"
9 
1
/
4
"
15 
5
/
8
"










