Specifications

Installation & Operation Manual for Flexible Batch Broiler
Australian Units
8
2
4
3
5
4
4
5
4
8
6
7
1. Using a utility knife, cut away plastic wrap
(Not shown).
2. Remove Training Material Box.
3. Remove the top cardboard and inner cap
4. Remove cardboard from the corners
(4 places).
5. Remove cardboard on the ends (2 places).
6. Remove banding straps (Cut with utility knife or
scissors: 5 places).
7. Remove box of attachable parts & accessories
from the front.
8. Safely lift one end of broiler and tap block towards
center and then sideways to remove. Repeat for
remaining blocks. This allows casters to touch the
pallet.
9. While carefully supporting broiler, slowly
roll it off the pallet taking care not to damage the
casters.
10. Remove blue tape from broiler panels.
Check for concealed damage. The carrier must be
notied within fteen (15) days of the delivery of
the broiler and the carton, skid and all packaging
materials must be retained for inspection.
Duke Manufacturing Co. cannot assume liability
for loss or damage suffered in transit. The carrier
assumes full responsibility for delivery in good order
when the shipment was accepted. However, we
are prepared to assist you with ling your claim.