Service manual
15
Service Manual for Flexible Batch Broiler Units
8. Reverse procedure to install a new Conveyor Drive
Motor Sprocket, ensuring that one set screw is
tightened to the at side of the motor shaft.
NOTE: When installing the new Conveyor Drive
Motor Sprocket, be sure to engage the chain on the motor
sprocket and conveyor sprocket, then adjust the tension
on the chain to allow 3/16″ chain deection as described
in the procedure DRIVE CHAIN DEFLECTION
ADJUSTMENT in the ADJUSTMENT Section, before
tightening the motor mounting plate screws.
Conveyor Drive Motor Capacitor
WARNING
DISCONNECT THE ELECTRICAL POWER
TO THE BROILER AND FOLLOW
LOCKOUT / TAGOUT PROCEDURES.
1. Remove the Upper Lift Off Panel. Refer to the
COVERS and PANELS section of the manual.
2. Remove Lower Control Side Service Panel. Refer to
the COVERS and PANELS section of the manual.
3. Disconnect wires to Conveyor Drive Motor
Capacitor.
4. Discharge the capacitor. Ground the two leads to
the broiler frame.
5. Remove screw securing capacitor to frame and
remove Conveyor Drive Motor Capacitor.
6. Reverse procedure to install a new Conveyor Drive
Motor Capacitor.
Conveyor
Drive Motor
Capacitor
Conveyor Drive Motor Capacitor
Blower Hose
WARNING
DISCONNECT THE ELECTRICAL POWER
TO THE BROILER AND FOLLOW
LOCKOUT / TAGOUT PROCEDURES.