Technical data

Set-up instructions
Operating manual 806N Version 00.0 - 12/2012 95
Cover (4) - Front left
1. Simply hang the cover in place.
Cover (7) - Front right
1. Fit the cover downwards into the guide hooks.
2. Pull the cover upwards.
3. Fit the cover upwards into the guide hooks.
1. Release the screw using a hex key through the front middle hole.
Cover (8) - Stacker
1. Pivot the stacker away from the machine.
2. Fit the cover from above.
3. Tighten the hex screw at the outer left of the cover.
4. Tighten the hex screw at the outer right of the cover.
5. Attach the earthing cable at the inner right.
6. Pivot the stacker towards the machine.
6.4 Removing the transport locks
Transport locks and fasteners for preventing transport damage are
located at the following positions on the machine:
Sewing head
Edge folding station
•Stacker
Transfer carriage
The correct procedure for removing all transport locks is as follows:
1. Remove all covers above the table top, Section 6.3 Removing/
installing covers.
Sewing head 2. Release the screws (2) on the metal ring (1).
3. Remove the metal ring (1) from the sewing head pressure cylinder.
The sewing head transport lock has now been removed. The sewing
head can be moved freely.
Material damage if transport locks are not removed.
Incomplete removal of the transport locks can damage or destroy
the machine.
Remove ALL listed transport locks.
ATTENTION