Technical data

Set-up instructions
102 Operating manual 806N Version 00.0 - 12/2012
1. Release the screws on the head cover.
2. Remove the head cover.
3. Oil the wick and felt at positions (1) and (2) by applying a small
amount of oil directly from the oil can to the marked positions.
4. Fit the head cover.
5. Tighten the screws on the head cover.
6.6 Commissioning
The machine is delivered almost completely ready for operation. A test run
can be performed after performing the listed steps for set-up and connec-
tion of the machine.
More detailed information is proved in Section 5.2 Preparing the
machine for operation and Section 5.3 Carrying out a test run.
Inserting the
needle
A needle is already fitted if the machine is delivered without a shaping
assembly. A needle is not fitted if the machine is delivered with a shaping
assembly. Check that a needle is fitted before starting the machine. If a
needle is not fitted on delivery, a sewing thread is still threaded in the
machine and the needle is attached to this.