Operating instructions

2. General and transport packing
CAUTION:
The sewing unit may only be set up by trained specialist personnel.
2.1 Transport packing
The transport packing must be removed before setting-up.
Remove the safety straps and battens from the upper part of the
machine, table and frame.
Remove the safety block and straps from the motor.
2.2 Connecting the control unit (PC)
Connect plug connector 1.
Screw on supply lead 2.
2.2.1 Check date and time
Attention:
After s witching on the machine, check the system date 3 without fail!
Check the date and correct it if necessary.
Check the time (AM or PM) and correct it if necessary.
2
3
3
1
2