Operating instructions
Table Of Contents

2. General and transport packing
CAUTION:
The sewing unit may only be set up by trained specialist personnel.
2.1 Transport packing
The transport packing must be removed before setting-up.
–
Remove the safety straps and battens from the upper part of the
machine, table and frame.
–
Remove the safety block and straps from the motor.
2.2 Connecting the control unit (PC)
–
Connect plug connector 1.
–
Screw on supply lead 2.
2.2.1 Check date and time
Attention:
After s witching on the machine, check the system date 3 without fail!
–
Check the date and correct it if necessary.
–
Check the time (AM or PM) and correct it if necessary.
2
3
3
1
2