Operating instructions

Index Page:
Part 2: Installation Instructions cl. 510 (DAC III)
1. Scope of delivery.............................................. 3
2. General notes and transport securing devices .......................... 3
3. Mount stand and control circuitry cabinet
3.1 Tabletops................................................... 5
3.2 Mount the stand parts ............................................ 5
3.3 Completethetabletop........................................... 6
3.4 Connect the control box to the main switch ............................... 7
3.5 Mount the reference value transmitter and the potential compensation .............. 8
3.6 Adjustworkingheight............................................ 9
4. Assembly of automatic bartacker
4.1 Mount the oil pan .............................................. 10
4.2 Setuptheautomaticbartacker...................................... 11
4.3 Mount the oil lines .............................................. 12
4.4 Mount the control panel .......................................... 12
4.5 Mount the covering cap .......................................... 13
5. Connect the plug connections to the control box
5.1 Plug connections at the multiple pin strip (4-fold) ........................... 14
5.2 Plug connections at the multiple pin strip (15-fold) .......................... 15
5.3 Cablelaying ................................................. 16
6. Change sew ing feet and fabric support plate............................ 17
7. Fit eye protection ............................................. 18
8. Convert automatic bartacker 510-213 to thick fabrics
8.1 General notes ................................................ 19
8.2 Adjustclampheight............................................. 20
8.3 Change thread wiper ............................................ 20
8.4 Change stop position ............................................ 20
9. Oil lubrication
9.1 Fillupoil ................................................... 21
9.2 Oilwicksandfeltpartintheoilpan ................................... 22
9.3 Oil hook path ................................................. 23
10. Putting into operation
10.1 Standard delivery .............................................. 23
10.2 Softwareinstallationl............................................ 24
10.2.1 General .................................................... 24
10.2.2 Loading the program ............................................ 24
10.2.3 Dongle-Update via internet ........................................ 26
10.3 Sewingtest.................................................. 27
11. Optional equipment
11.1 Sewinglight ................................................. 28
2