Operating instructions

3.5 Mount the reference value transmitter and the potential compensation
Screw the reference value transmitter 5 on the stand strut with
fixing link 1.
Hook the ball mugs of the pedal bars 6 in at the pedal and at the
reference value transmitter 5.
Screw the potential compensation cable 2 on the fixing link 1.
Screw the potential compensation cable 2 of the reference value
transmitter and the potential compensation cable 4 of the
sewing automate tight on the control box by means of screw 3.
8
1
2
3
6
5
4