User manual
DTS Broadcast   PDH Microwave Digital Radio User Manual 
-79-
7.8 Commissioning The Protection System 
Before applying power to the system, select the relevant protection mode of operation for the 
installation on the redundant system controller front panel using the two-position rocker switch located 
on the right side of the shelf. Select “A” on-line using the three-position rocker switch located on the 
protection switch front panel. 
7.8.1 Hot Standby Protection Mode 
Use Section 5 as a general guide, but read the following instructions first: 
1. Verify that all interconnect cables are installed. 
  Power up IDU. 
  Set upper IDU Traffic Capacity, Frequency, Transmit Power, Link ID Code and Tributary 
Configuration per section 5.5. 
4. Press HS key in the switch. 
  Select “B” on-line using the three position rocker switch located on the protection switch front 
panel. 
  Set lower IDU Traffic Capacity, Frequency, Transmit Power, Link ID Code and Tributary 
Configuration per section 4.5. 
Note The setup of the both upper and lower L54’s must be identical for correct system 
operation. 
7. Align the antenna using the guidelines given in Section 5.6. 
  Select “A” then “AUTO” function on the switch using the three position rocker switch located  on 
the front panel. 
  LEDs for IDU should be normal: WORK led flicker, POWER led light on, and the other leds 
light off. 
  The B, B TX and FD LEDs for switch should be light off, the others should be light on. 
This indicates that B is functional and standing by. 
The Hot Standby Protection System is now ready to carry traffic. 










