4.
TRANSPORTATION, INSPECTION, AND INSTALLATION
4.1.
HOW TO TRANSPORT THE SYSTEM
Note: Do not transport in a horizontal position. Cabinets should be maintained upright within +/- 15°
of the vertical during handling.
4.2. INSPECTION
4.2.1.
Upon receipt, inspect the container and pallet for shipping damage.
If there was any dam-
age during transportation; Do Not turn on the unit. Immediately notify the
shipping
agent
/transportation carrier and DSPM.
If no damage is evident, move the
packed DSPM UPS to its installation location.
The packaging is recyclable; keep it for reuse or please disposed of it.
4.2.2.
Using care to avoid puncturing the shipping material with any sharp objects, which would
damage the contents, open the shipping material by carefully removing any banding and
shipping material from the sides, ends and top.
4.2.3.
Remove the packing and vapor barrier and inspect the equipment for any obvious shipping damage. It
is recommended that the units not be loosened from the shipping pallet until after all handling by forklift
or pallet jack is completed.
4.2.4.
Immediately file a claim with the shipping agency if any damage, as a result of shipping, is observed.
4.2.5.
Follow these steps to inspect all surfaces for abrasions and dents:
4.2.5.
1.
Open the front door of the cabinet.
4.2.5.
2.
Verify that all the transformers, inductors, electrical, and electronic devices are firmly mounted.
4.2.5.3.
Verify that the transformer coils and terminal lugs are free of contact with any grounded metal
surface and that the transformer terminal wires are securely connected.
4.2.5.4.
Verify that the internal Wiring is not damaged.
4.2.5.5.
Verify that all wires to and from the output filter assembly, input
filter assembly, inverter assem-
bly, and bypass switch are securely connected.
4.2.5.6.
Verify that the circuit breakers are firmly seated and that the wires are securely connected.
4.2.5.
7.
Inspect all batteries for damage (cracks, leaks, loose connections, etc.,)
4.2.5.8.
Reinstall all panels, covers and close all doors.
4.3
LOCATION AND PLACEMENT
4.3.1.
Before starting, check the load tolerance of the floor and
verify that the floor will be able to support the UPS
at its final destination and the route to get it there.
After verifying the weights verify that when the unit is
placed in its final position that the minimum clearances required have been met.
Install the Emergency
Lighting Inverter System in a protected area with adequate airflow and free from excessive dust. Do
not operate the Emergency Lighting Inverter System where the temperature and humidity is out of
the specified limits. Water Dots are placed on every shelf and door panel to indicate if moisture is
present or has got inside the unit. The Dots are originally white in color but will turn red when water
is absorbed.
WARNING: Condensation of water may occur if the system is unpacked in a very low temperature
environment. In this case it is necessary to wait until the system is fully dry inside before proceeding
with the connection of any power; otherwise an electrical shock hazards might exist. Installation and
wiring must be performed in accordance with the local electrical code and under the guidance or in-
structions of professional personnel.
Note: Per code requirements, leave 3” on each side of the cabinet (including the back)
and 3 foot clearance in front (Refer to Figure 5).
Storage of the system should be in a cool and dry area with the unit being upright and covered. The
warranty can be affected if the unit is stored for more then 3 months without charging the batteries.
Operating Temperature: 0º to 40ºC (32º to 104ºF); Storage Temperature: -20º to 60ºC (-4º to 140ºF)