User manual
80
Programs
TPS400-5.0.1en
Construction
This application allows to define a construction site
by combining set-up of the instrument along a
construction line, measuring and setting out points
in relation to the line.
After selecting the application you have two
options:
a) Defining a new construction site
or
b) Continue with previous site (skips set-up)
Procedure:
Defining new site:
1. Measure line Start point [ALL], [DIST]+[REC]
2. Measure second line point [ALL], [DIST]+[REC]
)
In case, you have entered coordinates by
ENH and measured to known points a plausibility
check informs you about the calculated line length,
the actual length and the difference.
As built check:
This dialog shows you the
SLine, SOffset and
SHeight of a measured point in relation to the line.
[ShiftLn] Allows you to enter values for
shifting the line.
[LAYOUT] Switches to Layout-mode.
SLine is positive:
Measured point is in direction from line start - to line
end point.
SOffset is positive:
Measured point is right of line.
SHeight is positive:
PtID :
A11
hr : 1.500 m
: 7.225 m
Off: 10.194 m
: -1.673 m