Instructions / Assembly

7
EE
DD
DD
6
Making the electrical connections
Ground wire
from supply
Ground wire from fixture
with the label “G”
Green ground screw
Trimming excess xture wire
5
Unthread the canopy lock ring.
Slide the canopy lock ring and the ceiling canopy (EE) down
the quick link (DD).
Push all slack xture wire through the canopy chain loop and
into the outlet box.
Trim excess xture wire leaving a minimum of 6 inches
hanging out of the outlet box.
Separate the smooth side and ribbed side of the supply wire to
about 3 inches from the end.
Using wire strippers, strip each wire ½ inch from the end.
Supply Wire
and Ground Wire
Canopy Lock Ring
Black (or red)
wire from supply
Ribbed side of wire from
fixture identified with the
label “N”
Smooth side of wire from
fixture identified with the label “L”
White wire from supply
Installation (continued)
CC
* Use wire connectors (CC) to connect the wires.
Ground wire:
1. Wrap the supply ground wire around the green ground
screw on the crossbar assembly (AA), no less than 2 in. from
the end of the wire. Tighten ground screw.
2. Connect the xture ground wire to the supply ground wire
with the wire connector (CC).
Supply wire:
1. Connect the house white wire to the xture supply wire
(ribbed sided) from xture identied with the label “N”.
2. Connect the house black (or red) wire to the xture supply
wire (smooth side) from xture identied with the label “L”.
3. Wrap each connection with approved electrical tape and
carefully insert all of the connected wires into the outlet box.