Instructions / Assembly

Pre-Installation
PLANNING INSTALLATION
Read all the instructions before installing.
To avoid damaging this product, place it on a soft, non-abrasive surface, such as carpet or cardboard.
HARDWARE INCLUDED
3
NOTE: Hardware is not shown to actual size.
Phillips
Screwdriver
Wire
Stripper
Pliers
Safety
Goggles
Electrical
Tape
Ladder
IMPORTANT: Inspect the wire insulation for any cuts,
abrasions, or exposed copper that may have occurred
during shipping. If there is a defect in the wire, do not
attempt installation. Please call Customer Service Team at
1-800-388-6141 ext 216. For customer service support
and the fastest response, please email us at
CustomerSupport@DSILighting.com.
AA
BB CC
Part Description Quantity
AA Crossbar assembly 1
BB
3
CC
Outlet box screw 2
Wire connector
TOOLS RECOMMENDED (NOT INCLUDED)
NOTE: This product requires one 60W maximum
medium base (E26) type "S" or type "A" or 9W
maximum medium base (E26) self-ballasted LED
vintage Edison bulbs (sold separately).