Instructions / Assembly
Installation (continued)
6
A
B
B
C
C
C
D
Installing the rods and the ceiling canopy
3
AA
CC
□
□
4
Making the electrical connections
* Use wire connectors (CC) to connect the wires.
Ground wire:
1. Wrap the supply ground wire around the green ground screw
on the crossbar assembly (AA), no less than 2 in. from the end
of the wire. Tighten the ground screw.
2. Connect the xture ground wire to the supply ground wire
with a wire connector (CC).
Supply wire:
1. Connect the supply white wire to the white xture supply
wire with a wire connector (CC).
2. Connect the supply black (or red) wire to the black xture
supply wire with a wire connector (CC).
3. Wrap each connection with approved electrical tape and
carefully insert all of the connected wires into the outlet box.
Green ground screw
□
□
□
□
□
Choose desired hanging length for the light xture.
Assemble the rods (B/C) to the desired length.
Pass the supply wires and the ground wires through the rod assembly.
Attach the rod assembly to the socket assembly (D), hand-tighten until snug.
Thread the ceiling canopy (A) to the uppermost rod. Hand-tighten until snug.
Hint:
- Assemble one rod at a time.
- Pass the ground wire through the rod rst.
- Then, pass the supply wire through the rod.
- Thread the rod by hand until snug.
Suggested rod length to hang xture 30 inches above table top:
- 8 ft. ceiling (2) 6 in. rods + (1) 12 in. rods
- 9 ft. ceiling (2) 6 in. rods + (2) 12 in. rods
- 10 ft. ceiling (2) 6 in. rods + (3) 12 in. rods










