Product Manual

HeatPack Furnace Installation and Operation Manual
28
o Mechanical ventilation system: if the house is equipped with a ventilation system (air
exchanger or heat recovery), the ventilation system may provide sufficient auxiliary air
to the solid fuel unit. Otherwise, the owner should be informed that the ventilation
system may have to be rebalanced by a ventilation technician after the installation of
the solid fuel unit.
9 Electrical connection, adjustment of components and
calibration of the draw
The furnace is fully assembled at the factory and no electrical connection is required other
than plugging the power cord into an outlet.
9.1 Raccordement électrique
WARNING
THE FOLLOWING INSTRUCTIONS DO NOT REPLACE THOSE OF THE LOCAL
CODE.
INSTALLATION AND VERIFICATION OF THIS APPLIANCE MUST BE DONE BY
A QUALIFIED PERSON.
ONLY USE WIRES SUITABLE FOR 167 °F (75 °C) OR MORE
All wiring from the service panel to the heating unit must comply with the electrical code in
force and all local regulations. It is recommended to feed the furnace with its own electrical
circuit of 15 amps at 120 volts with a breaker (see wiring diagram).