Product Manual

HeatPack Furnace Installation and Operation Manual
24
7.3 Installation of the assembled plenum on the furnace
Step 1 : Identify the right side of the plenum, it
is provided with holes for the installation of the
“RTD” thermal probe.
Also, 5 holes are aligned with the fold of the
top of the furnace on the right side and three
holes on the other sides. This allows you to
secure the plenum properly.
Step 2 : Install the assembly on the
furnace, taking care to insert the 4 fold
on top of the furnace inside the
plenum.
Step 3 : Using 14 black screws (C) #10 x 5/8", secure the plenum to the furnace.