Specifications
Page 16 • DRI-STEEM XT Electrode Steam Humidifier Installation, Operation, and Maintenance Manual
Installation
Piping: 
XT steam blowers
o
Figure 16-1:
Piping from XT humidifier steam cylinders to XT steam blowers (XTSB)
XTSB mounted remotely
XTSB mounted directly on top of 
XT humidifier
Hose clamp (provided)
Hose clamp (provided)
Steam hose (provided)
OM-7603
Plastic tie
Condensate hose 
(purchased separately  
from DRI-STEEM)
Plastic tie
Hose clamp (provided)
Steam hose (purchased separately from DRI-STEEM)
Hose clamp (provided)
To open drain or humidifier fill cup
Water seal is required, whether condensate is piped to open 
drain or returned to humidifier fill cup.
OM-7602
7” (178 mm) 
water seal
Maximum recommended distance between 
humidifier and XTSB is 10’ (3 m).
mc_091010_0939










