Specifications

43
VAPORMIST INSTALLATION, OPERATION, AND MAINTENANCE MANUAL
Install the probe and probe plug assembly. Verify ground wire is solidly
connected to tank.
Secure the chamber cover, making sure the cover gasket is seated and
the chamber is sealed.
Re-install evaporating chamber:
Reconnect the fill line.
Reconnect electrical plugs (the plugs are color coded).
Reconnect the drain union.
Reconnect the steam hose.
Verify electrical connections:
Verify that all DIN rail-mounted components are securely fastened to
DIN rail.
Verify that all power terminal screws and lugs are tight from power
block to heaters.
Verify that all plugs under the humidifier cover are completely
plugged in.
Move the drain valve lever back to the auto position.
Turn on the water supply.
Turn on the electrical power.
3. Off-season maintenance
Perform complete inspection and cleaning of the following:
– Heaters
– Probe rods
Skimmer port and water seal
– Humidifier tank
After cleaning, the humidifier should remain empty until humidification is
required.
OFF-SEASON SHUT-DOWN PROCEDURE
1. Switch off electrical power.
2. Remove the enclosure.
3. Shut off the water supply to the makeup valve.
4. Drain the evaporating chamber, and clean if necessary following the
instructions in this manual.
5. Replace the enclosure.
6. Leave the evaporating chamber dry, the power off, and the water shut-off
valve closed until the next humidification season.
MAINTENANCE
Tap/softened water