Specifications
13
MAINTENANCE
6. Remove the evaporating chamber as follows:
Disconnect the flexible connector tube on top of the
evaporating chamber, the flexible overflow hose,
and the flexible drain hose. All connections should
be removed at the evaporating chamber. DO NOT
DISCONNECT ANY OF THE ELECTRICAL
CONDUITS.
7. Slide the evaporating chamber forward on the track.
Remove the cover of the chamber, raise and slide
into holding slots.
8. Check operation of the float valve, inspect valve seat
and heater cut-off.
9. Inspect the heating elements. Replace if
inoperative.
10. Inspect the evaporating chamber. Clean if
necessary.
11. Replace the chamber cover and slide chamber back
into unit.
12. Reconnect connector tube and flexible hoses.
13. Return drain valve handle to closed position.
14. Replace front panel and turn on electric power.
15. VAPORMIST DI is again ready to humidify.
Off-Season Shut-Down Procedure
1. Switch off electric power.
2. Remove front panel.
3. Shut off water supply to make-up valve.
4. Drain evaporating chamber by manually opening the
drain valve.
5. Replace front panel.
6. Leave chamber dry, power off, and water shut off
valve closed until the next humidification season.
VM-IOM-1996 Scan.pdf 13 11/19/2009 9:57:23 AM










