Specifications

1BHFt%3*45&&.)VNJEJUFDI&MFDUSJD)VNJEJGJFS*OTUBMMBUJPO0QFSBUJPOBOE.BJOUFOBODF.BOVBM
Installation
Figure 18-1:
Drip tee installation
%JTQFSTJPO
%SJQUFFJOTUBMMBUJPO
Drip tee installation
Install a drip tee as shown below when the humidifier is mounted
higher than the dispersion assembly, when interconnecting hose or
piping needs to go over an obstruction, or when interconnecting
piping runs are long.
Important: Vapor hose must be supported to prevent sagging
or low spots.
DC-1450
90° long sweep or two 45° elbows
Obstruction
Insulate tubing and hard pipe to reduce steam loss
To dispersion assembly
150 mm recommended
200 mm minimum
25 mm air gap
Open funnel or floor drain. See first note below.
DN20
Tubing or pipe drip tee, by installer. DRI-STEEM
part numbers for 304 stainless steel inline tees:
t %//P
t %//P
Pitch
Humidi-tech
humidifier
Notes:
t -PDBUFBJSHBQPOMZJOTQBDFTXJUIBEFRVBUFUFNQFSBUVSFBOEBJSNPWFNFOUUPBCTPSCnBTITUFBNPUIFSXJTFDPOEFOTBUJPONBZGPSNPOOFBSCZTVSGBDFT3FGFS
to governing codes for drain pipe size and maximum discharge water temperature.
t 4VQQPSUTUFBNIPTFTPUIFSFBSFOPTBHTPSMPXTQPUT
t %BTIFEMJOFTJOEJDBUFQSPWJEFECZJOTUBMMFS
WARNING
Hot surface and steam hazard
Dispersion tube, steam hose, tubing, or
hard pipe can contain steam, and surfaces
can be hot. Discharged steam is not
visible. Contact with hot surfaces or air
into which steam has been discharged can
cause severe personal injury.