Specifications

16
MOUNTING THE HUMIDIFIER
For proper operation of the electrode-probe, water-level
control and the skimmer system, the humidifier must be
mounted level left to right and front to rear.
Proper access (18" minimum) for periodic removal of the
top cover is recommended. In most cases, scale that
forms on the heat exchanger continuously flakes off as it
forms and settles to the bottom. A clean-out tray on the
floor of the tank may be removed periodically through the
back clean-out opening.
Trapeze
(GTS 75 & 100 only)
Note:
The trapeze bars will span the width of the tank and should be resting against the
front and rear tank flanges. Holes should be drilled in overhead support to provide
vertical installation of threaded rod. Double nuts are recommended below the
trapeze bars and above the overhead support. Unit must be installed level in all
directions and clearances must be provided according to the nameplate (rating plate)
on the humidifier.
Figure 16-1: Mounting Support Methods
OM-763
Double Nut
Vent
Angle iron supported on roof
trusses or other overhead
structure capable of holding
weight (field provided)
3/8" Threaded Rod
Rear Tank
Flange
Angle Iron
Trapeze Bars
Front Tank Flange
Vent
3 Mounting
Holes Requiring
1/4" x 20 Bolts
Support Legs
Floor Stand
GTS-IOM-1298.pdf 16 11/17/2009 3:57:04 PM