Use and Care Manual
Drinkpod LLC 888 852 7873
www.drinkpod.com
11
Installing The ConstantBrew Water Line
Step #4 – Connecting Assembly 1 to ice maker.
Now we want to hook up Connect Point (C1) on Assembly 1 to your ice maker (water line).
If your hose is threaded (1/4 in. O.D. compression):
Screw it onto Connect Point (D) on Assembly 2 (included with your kit. If it’s not threaded, skip
this part.
Step #4 (continued)
Now insert the tubing of your ice maker hose or (if it is threaded) Connect Point (C2) on
Assembly 2 to Connect Point (C1) on the Assembly 1.
Assembly 2
Connect Point (C2)
Connect Point (D)
Assembly 1
Connect Point (C1)
Connect Point (C2)
Assembly 2
Connect Point (D)
Step #5 – Confirm Assembly 1 shutoff valve is closed.
Before we open your ice maker water source shutoff valve, we want to make sure that the valve
on your Assembly 1 is closed so water doesn’t spray everywhere. The handle should be twisted
so that it is perpendicular to the ports at either end.
Step #6 – Open ice maker water source shutoff
valve.
Now you can re-open (turn back on) the valve on your
ice maker box (water source).