User`s guide
1. Press the MANUAL
key to display the MANUAL
OPERATIONS screen. The
manual STATION option is
chosen by default
2. Press the Dial to select
STATION – the next
MANUAL OPERATIONS
screen in sequence will
be displayed. Station 1 is
selected by default.
3. Turn the Dial right one step
to choose the
RUN TIME value. Press
the Dial to select the time
value– the hours digits will
begin ashing. Turn the Dial right one step to display
one hour (01:00). Press the Dial to enter– the minutes
digits will be selected. Simply press the Dial to enter
00 minutes for this procedure.
4 Insert the control wire you wish to identify to station 1
terminal.
5. Turn the Dial right one step
to choose START, then press
the Dial to begin operation.
The Irrigation LED will
illuminate, and the remaining run time for STATION 1 will
begin counting down. Note the corresponding sprinkler
operation.
6. Deactivate Station 1 by
pressing the Dial to toggle
from START to STOP.
7. Remove the control wire, then repeat steps 4–6 to test
the remaining control wires as needed.
8. When nished press the
HOME key to return to
the Home screen.
Caution: The method of eld wire identication by momentarily contacting a eld control wire to an energized
output terminal can damage the solid-state components of the Eagle Plus controller, and must not be used.
An alternate similar method that can be used safely with the Eagle Plus is accomplished as follows:
[STATION] -PROGRAM-
MANUAL OPERATIONS:
-TEST-
-MULTI STATION-
STATION- 1-
MANUAL OPERATIONS:
[START]
RUNTIME- 1:00-
MVALVE:OFF PUMP:OFF
STATION: 1 00:59:45
-NEXT- -PREVIOUS-
[STOP]
Identifying Field Wire Connections
• Single Station: Tests a selected Decoder station number.
• FindDecoders: Tests and displays all controller stations
with an associated decoder address.
• AllProgrammed: Tests all decoder stations with a
dened address (1–200, Master Valve or Pump).
• AllStations: Tests all decoder stations, Master Valve and
Pump controls.
• AlarmLoggingOptions: Test results can be logged as
Alarms indicating Pass and/or Fail as selected.
••LogFailAlarm: When selected, a decoder station that
fails the test criteria will be logged.
••LogPassAlarm: When selected, a decoder station that
passes the test criteria will be logged
Note: Only the Single Station Test procedure is provided in this
guide. Refer to the Eagle Plus user’s guide for Find Decoder,
All Stations and All Programmed test procedures.
Single Station Test Procedure
1. Press the SETUP key to
display the SETUP menu.
Turn the Dial to choose the
TWOWIRE option, then
press the Dial to select.
The SETUP TWOWIRE
menu screen is displayed
with the PROGRAM
DECODER option chosen by
default.
2. Turn the Dial to choose the
TEST option, then press the
Dial to select.
3. The SETUP TWOWIRE TEST
screen is displayed with
SINGLE STATION test type
chosen by default.
4. Turn the Dial to choose the
LOG FAILURES option. The
YES option is selected by
default.
To disable this function, turn the Dial to display NO, then
press the Dial to enter.
5. Turn the Dial to choose the
LOG PASS option. The NO
option is selected by default.
To enable this function, turn
the Dial to display YES, then
press the Dial to enter.
6. Turn the Dial to choose
GO, then press the Dial
to continue.
7. The SINGLE STATION TEST
screen will be displayed
with STATION 1 chosen by
default. To change the station
selection, press the Dial to
select, turn the Dial to display
the preferred station number,
then press the Dial to enter.
8. Turn the Dial to choose GO,
then press the Dial to start
the test.
9. The test results will be
displayed. Based on the
Alarm Log options selected,
an alarm may be generated.
Note: To pause or stop the test, turn the Dial to choose
STOP, then press the Dial to pause the test. To resume the
test, press the Dial again. To terminate the test, press the
BACK key.
10. Press the HOME key to
return to the Home screen.
Turn the Dial to choose
ALARMS, then press the Dial
to review the Alarm screen.
11. Turn the Dial to choose
CLEAR, then press the Dial to
clear the alarm.
Note: Clearing alarms removes the screen prompts and
extinguishes the Alarm LED indicator. Logged alarm
information is accessible from the REVIEW menu screen.
The Two-Wire Decoder system test feature provides methods of testing the decoder installation to easily verify
communication, station assignment and operating status and log the results. The following test options are available:
Testing the Two-Wire Decoder System
STATION[ 1]
MANUAL OPERATIONS:
-START-
RUNTIME-00:00-
STATION- 1-
MANUAL OPERATIONS:
-START-
RUNTIME[01:00]
TYPE-SINGLE STATION-
LOG FAILURES-YES-
LOG PASS[ NO] -GO-
SETUP TWO-WIRE TEST
TYPE-SINGLE STATION-
LOG FAILURES-YES-
LOG PASS-YES- [GO]
SETUP TWO-WIRE TEST
-CONTROLLER- -FLOW-
–PROGRAM– –COMM–
SETUP:
–ET– [TWO–WIRE]
7
STATION- 1-
[GO]
SINGLE STATION TEST
TESTING STATION: 12
TESTING CURRENT: .18
VERSION: 0 [STOP]
SETUP TWO-WIRE TEST:
VALID PGM:NONE
WE 02:47:41P WK1
-MAIN-[ALARMS( 1)]
[PROGRAM DECODER]
-SHOW STATIONS-
-TEST-
SETUP TWO-WIRE
-PROGRAM DECODER-
-SHOW STATIONS-
[TEST]
SETUP TWO-WIRE
VALID PGM:NONE
TH 02:45:39P WK1
[MAIN]
TYPE[SINGLE STATION]
LOG FAILURES-YES-
LOG PASS-YES- -GO-
SETUP TWO-WIRE TEST
STATION[ 1]
-GO-
SINGLE STATION TEST
STATION[ 12]
-GO-
SINGLE STATION TEST
STATION 12
06/16 WE 02:48:01P
[CLEAR]
DECODER FOUND
TYPE-SINGLE STATION-
LOG FAILURES[ NO]
LOG PASS- NO- -GO-
SETUP TWO-WIRE TEST










