User`s guide
Installing the Pedestal-mount Enclosure Controller
1. Prepare a concrete mounting slab per the dimensions
shown in Figure 4. Use the provided template to properly
position four stainless mounting bolts and wiring access
conduit into slab. Allow concrete to harden suciently
before continuing.
Note: Although the SPED and PSB pedestal base footprints vary
slightly, the same mounting bolt pattern shown applies to both
pedestal styles.
2. Unlock and raise pedestal lid to remove pedestal door.
Position the pedestal on the slab, aligning the mounting
bolts with the holes in the pedestal base. Place a stainless
washer and nut on each stud and tighten securely.
WARNING: All electrical service installation
components and methods must comply with NEC and
local electrical codes that apply. Most codes require a
means in the xed wiring of disconnecting the AC power
mains with a mechanical contact separation of at least
0.120” (3mm) in the line and the neutral poles.
The connection wire must have insulation rating of 221°F
(105°C) minimum.
CONFIRM THAT THE AC POWER SOURCE IS OFF PRIOR
TO CONNECTING WIRES.
1. Install a conduit box to the base of the power supply unit
(½” NPT nipple) and 1” conduit (AC). See Figure 5.
2. Ensure the power is disconnected at the source. Conrm the
On/O power toggle switch in the OFF (down) position.
3. Remove top screw from conduit box cover and position cover
to the side.
4. Route the AC power and equipment ground wires from the
source into the controller conduit box.
5. Strip wire ends to expose ⁄” (9,5mm) bare copper wire.
6. Using insulated wire splice connectors, connect the wires as
follows:
Line (Hot) to Black, Neutral (Common) to White, and
Equipment Ground to Green.
7. Close and secure conduit box cover.
Note: Internal component arrangement will vary per controller
model. All wiring connection procedures including AC power,
earth ground, station output, eld auxiliary, and two-wire
decoder are applicable to all Eagle Plus controller models.
Figure 4
Connecting Input Power Wiring
Figure 5
8” 20cm)
Mounting Bolts (4 places)
FRONT
S1
S2
P
S
P/MV
A
D
G
1” Conduit:
P - Power
S - Sensor
P/ - Pump/
Master Valve
G - Ground
C - Decoder
A - Auxiliary
2” Conduit:
S1 - Stations (1– 24)
S2 - Stations (25– 48)
Neutral
Equipment
Ground
Line
28”
(71cm)
11.5”
(29,2cm)
14.5” (36,8cm)
28”
(71cm)
6” (15cm)










