Installation Guide
“SLIMLINE SHOWER BASE” Ver.5 Rev.6 10/2015 
12 
Shower Base Installation - Preparation 
1.  Ensure that the floor and the studs 
are at right angles. 
Provide a 5”×5” opening in the sub-
floor for the drain. 
The 2” PVC waste pipe should 
extend above the surface of the 
sub-floor according to the drain 
installation instructions and the 
height of the Shower base. 
Refer to the product drawings and 
tables in these installation 
instructions for the drain location. 
See Fig. 1 and Fig. 2 for details. 
  Fig. 1 
    Fig. 2 
(See Product Chart for Drain Location) 
(5"×5") Opening 
2" PVC Waste Pipe 
90° 
90° 
90° 
90° 
90° 
2" PVC Waste Pipe 
(5"×5") Opening 
(See Product Chart for Drain Location) 










