Installation Guide
“SLIMLINE SHOWER BASE” Ver.5 Rev.6 10/2015 
14 
4.  Level the tray and place marks on the 
studs above the upper edge of the tile 
flange. 
See Fig. 5 for details. 
5.  Mix  the  bedding  material  (Mortar, 
cement-sand  mix,  etc.)  Concrete 
or plaster is not recommended. 
Apply  enough  bedding  material  
to  support  the  entire  bottom  of 
the  shower  base.  This  will  add 
additional stability and prevent the 
base from shifting position. 
See Fig. 6 for details. 
  Fig. 6 
Level base in two directions 
Mortar 
Fig. 5 










