Installation Guide

Q-Wall Tub manual Ver 1 Rev 2 11/2017
8
©2017 DreamLine. All Rights Reserved
Measure from the Vertical
Reference line 1” from corner
Vertical Reference
line 1” from corner
Fig 4b
D
S
= (D-1”)
E
F B
C
G
H
A1"
Trim line
back
corner
of walls
Right side wall fixtures
shown as an example
Measure the fixture
locations on the wall
Note:
This diagram represents the wall,
not the acrylic side panel.
Note:
This diagram represents a typical
fixture hole layout.
!
Record all applicable dimensions here:
A _______________________
shower head
B _______________________ lever
C _______________________ lever
D _______________________
S (D-1”)_________________
trim line
E _______________________
F _______________________
G _______________________
tub filler
H _______________________
These dimensions will be used
in Step#17 to drill the holes into
the acrylic Side Panel (#01)
.
4b. Measure the location of the holes on the wall
where the fixtures will be installed. Use these
measurements to drill the cutouts in the
corresponding Side Panel (#01) in Step #17.
Take exact measurements:
from the vertical reference line to the center of
the fixture holes: (A, B, C, G)
from the tub deck up to the center of the fixture
holes: (E, F, H). (Fig 4b)