Installation Guide
© DreamLine
All Rights Reserved
© DreamLine
All Rights Reserved
©2018 DreamLine. All Rights Reserved
9VISIONS Shower and Tub Door Manual Ver 2 08/2018
NOTE: The holes in the Wall Profiles (#02) are off-center and should align
with the holes in the glass profiles and the groove for the panel glass. (Fig 5.1)
Fig 6
Fig 5
1
2 3
Inside
of
shower
!
6. Move the assembled frame into position
on the threshold, and push the Wall Profiles
(#02) tight to the walls to compensate for any
out-of-plumb conditions. Push the bottom rail
down tight to the threshold and adjust the
frame to a vertical position.
Confirm with a level before marking the
position of the wall profiles and the holes for
drilling. (Fig 6)
5. Slide the Wall Profiles (#02) all the way onto the Glass Profiles (#01) on both sides. (Fig 5)