Installation Guide
©2017 DreamLine. All Rights Reserved
©2017 DreamLine. All Rights Reserved
14
INFINITY-Z shower and tub door manual Ver 5 08/2017
Fig 17
1
2
3
Ø1/8"
3/4”
!
of the wall profile and glass profile.
ATTENTION: Do Not drill the profiles throughout, only through the first layer
inside insideinside
15. Perform the final adjustment of the assembled unit within the Wall Profiles (#02) making sure the
bottom rail is tight to the threshold. Drill Ø1/8”holes in the center of the Wall Profile (#02) into the
Glass Profile (#01). Drill one hole at the top and one hole at the bottom of each profile.
Secure the Wall Profile (#02) to the Glass Profile (#01) using the Round Head Screws ST4.2x10 (#11)
and raised white washers. Cover the exposed scew heads with the Decorative Covers (#13) (Fig 17)