Installation Guide
©2017 DreamLine. All Rights Reserved
INFINITY-Z shower and tub door manual Ver 5 08/2017
7
(Bottom Guide Rail shown)
Fig 4
Fig 5
1
2
3-1/8"
Ø1/8"
ATTENTION: Do Not drill the Guide Rail
throughout, only through the first layer.
TIP: For ease of assembly, add some liquid soap, wax or lubricant to the screws prior to
attaching the glass profiles to the guide rails. Use a low setting on the power drill to
prevent stripping the screws.
!
!
4. Secure the Bottom Guide Rail (#03) and Top Guide Rail (#03) to the Glass Profiles (#01) with
the Round Head Screws ST4.2x25 (#10). (Fig 5)
3. After the Top and Bottom Guide Rails (#03)
have been cut to size, re-install the roller
stopper on both of the Top and Bottom Guide
Rails (#03) on the end that has been cut off (the
door end).
Remove the existing stopper. Mark the drilling
hole at a distance of 3-1/8” from the cut end of
the Top and Bottom Guide Rail (#03).
Drill a new hole using a Ø1/8” drill bit; then
re-secure the stopper with the screw. (Fig 4)