Infinity-Z Shower Door, Base & Backwall SHOWER DOOR, BASE & BACKWALL INSTALLATION INSTRUCTIONS IMPORTANT DreamLine® reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals, warranty information or additional details please refer to your model’s web page on DreamLine.
©2018 DreamLine. All Rights Reserved SLIMLINE SHOWER BASE SHOWER BASE DIMENSIONS AND INSTALLATION INSTRUCTIONS IMPORTANT! DreamLine® reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals, warranty information or additional details please refer to your model’s web page on DreamLine.
©2018 DreamLine. All Rights Reserved Preparation 1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece count with your packing slip. After opening all boxes and packages read this introduction carefully. Check that all of the needed parts are included in the package by checking off the components on the “Detailed Diagram of Shower Door Components”.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine.
©2018 DreamLine. All Rights Reserved Shower Base Installation - Preparation 1. Ensure that the floor and the studs are at right angles. Provide a 5”×5” opening in the subfloor for the drain. The 2” PVC waste pipe should extend above the surface of the sub-floor according to the drain installation instructions and the height of the Shower base. Refer to the product drawings and tables in this installation manual for the drain location. 90° 90° 90° See Fig. 1 and Fig. 2 for details.
©2018 DreamLine. All Rights Reserved 2. Install the shower drain (NOT INCLUDED) according to the drain installation manual (supplied with the drain). See Fig. 3 for example Fig. 3 3. Place the tray into the designated position so that the Drain cutout drops around the Drain Pipe and butt the Shower Base up against the studs. See Fig. 4 for details. Lower the base over the drain pipe and set it into place against the studs. Fig.
©2018 DreamLine. All Rights Reserved 4. Level the tray and place marks on the studs above the upper edge of the tile flange. See Fig. 5 for details. Level base in two directions Fig. 5 5. Mix the bedding material (Mortar, cement-sand mix, etc.) Concrete or plaster is not recommended. Apply enough bedding material to support the entire bottom of the shower base. This will add additional stability and prevent the base from shifting position. See Fig. 6 for details. Mortar Fig.
©2018 DreamLine. All Rights Reserved 6. After the bedding material has been poured and before it sets, place the shower base into the position with the drain assembly sliding over the PVC waste pipe. It will be necessary to push the shower base until the top of the tile flange aligns with the marks drawn on the studs and the front edge is contacting the rough floor along the entire length of the shower base. Ensure that the base is level in all directions.
©2018 DreamLine. All Rights Reserved Fig.
©2018 DreamLine. All Rights Reserved Product Maintenance BASES and BACKWALLS: To ensure long lasting life for your acrylic base and/or back walls: wipe them off after each use with a soft cloth. To clean the acrylic base or back walls use non-abrasive sprays or cream based cleaners. Avoid the use of aerosol spray cleaners. Never use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface.
TEL: 866-731-2244 FAX: 866-857-3638 DREAMLINE.COM For more information on DreamLine® Shower Doors and Enclosures please visit DreamLine.
QWALL – 5.2 (2 Back Panels) SHOWER ACRYLIC WALL INSTALLATION INSTRUCTIONS IMPORTANT DreamLineTM reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals or any other details please refer to your model’s web page on BathAuthority.com Please read these instructions carefully before installing.
Preparation 1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece count with your packing slip. After opening all boxes and packages read this introduction carefully. Check that all of the needed parts are included in the package by checking off the components on the “Detailed Diagram of Acrylic Shower Wall Components”.
Detailed Diagram of Acrylic Shower Wall Components 2 1 46 58 "- 50 "- 6 " 2" 3 4 5 6 10 7 8 9 Packing List 01 Side panel 2pcs 06 Wall anchor 21pcs 02 Corner cover 2pcs 07 Countersunk screw ST4.2×40 21pcs 03 Decorative edge molding 2pcs 08 Decorative cover 15pcs 04 Shelf bracket 6pcs 09 Back panel 2pcs 05 Glass shelf 2pcs 10 Center cover 1pc NOTE: Unpack your unit carefully and inspect it.
Preparation for Installation of Back Panel 1. Place a mark on the walls at a distance of 1” (one inch) from the corner and draw a plumb vertical line from top to bottom. 1 1" See Fig. 1 for details. NOTE: Repeat this step for both corners. 2 1" Fig. 1 2. The Shower back wall kit has two Back Panels (09). Measure the back wall of the shower between the vertical lines you marked in Step 1. This distance is marked as “W”. W See Fig. 2 for details. Fig. 2 Q-Wall 5.2 (w/two back panels) manual Ver.
3. Divide the measurement “W” by two and place a mark in the center of the back wall and from there draw a plumb vertical line from top to bottom. W/ 2 W/ 2 This distance is shown as “W/2”. See Fig. 3 for details. Fig. 3 4. Determine the position of both Back panels (09).
5. Measure the Back Panel (09). Width of the Back Panel has to be less than or equal to the distance between the center line and the corner line on the back wall in Step. 3 L ≤ W/2 L L If the width of the Back Panel is greater than the distance between the center line and the corner line on the back wall in Step. 3, you have to trim the Back Panel to fit your measurement. See Fig. 5 for details. Fig. 5 6.
7. Place the Back Panel (09) onto a flat piece of plywood or particle board. Use a sharp industrial knife and a T-square to score along the marked side ends of the Back panel and continue scoring until you have fully cut through the panel. See Fig. 7 and Fig. 8 for details. 1 2 Fig. 7 W/ 2 W/ 2 Fig. 8 Q-Wall 5.2 (w/two back panels) manual Ver. 1 Rev.
Preparation for Installation of Side Panels ATTENTION: If you are installing a shower door with a wall profile, you can hide the edge of the Side panel (01) behind the wall profile. Side Panel 1 Wall Profile Wall See Fig. 9 for details. Side Panel 2 Wall Profile Wall Fig. 9 8. Measure the side walls of the shower from the 1” (one inch) line in the corner (from Step. 1) to the distance where you want Side panels (01) to end. The distance is “D”. D D See Fig. 10 for details. Fig. 10 Q-Wall 5.
9. Determine the position of both Side panels (01). NOTE: a) The narrow edge of the Side panel fits behind the corner cover and cannot be trimmed. b) The wide edge of the Side panel can be trimmed to the size of your measurements from Step. 8. D D Line to cut Line to cut Measure from the narrow edge of the Side panel and place a mark at a distance of "D" (that you measured in Step. 8). Draw a straight line from top to bottom along the wide edge of the Side panel. See Fig. 11 for details. Fig. 11 10.
D D Fig. 13 11. Take exact measurements of the fixture on the wall: • • 1" D A from the 1” (one inch) line in the corner of the shower to the fixture: (A, B, C) from the bottom of the wall of the shower to the fixture: (E, F). See Fig. 14 for details. C E B F Fig. 14 Q-Wall 5.2 (w/two back panels) manual Ver. 1 Rev.
12. Determine which Side panel (01) will be installed on the side wall with the fixture. Mark the fixture location on the Side panel according to the measurements taken in Step. 11. A D See Fig. 15 for details. E F B C Fig. 15 13. Drill the holes for the fixtures in the Side panel (01) using the proper diameter saw bit or a handheld jig saw. D See Fig. 16 for details. Fig. 16 Q-Wall 5.2 (w/two back panels) manual Ver. 1 Rev.
Acrylic Back Panel and Side Panel Installation Instruction 14. Attach the Center cover (10) vertically at the center point along the line (from Step. 3) and mark the drilling holes through the predrilled holes in the Center cover. Drill the holes using Ø5/16” drill bit and insert the Wall Anchors (06). 1 2 3 4 See Fig. 17 for details. Ø5/16" Fig. 17 15. Mount the Center cover (10) to the centerline of the back wall using the Countersunk screws ST4.2×40 (07).
W/ 2 W/ 2 Fig. 19 16. Attach the Corner cover (02) to the corner of the shower and mark the drilling holes through the predrilled holes in the Corner cover. Move aside the Corner cover, Drill the holes using Ø5/16” drill bit and insert the Wall Anchors (06). See Fig. 20 and Fig. 21 for details 1 2 3 4 Ø5/16" Fig. 20 Q-Wall 5.2 (w/two back panels) manual Ver. 1 Rev.
W/ 2 W/ 2 Fig. 21 ATTENTION: Installation of all Acrylic panels must be finished before the sealant sets for easy leveling and adjustments. W/ 2 W/ 2 17. Apply the sealant to the entire surface of the reverse side of the Back panel (09). See Fig. 22 for details. Fig. 22 Q-Wall 5.2 (w/two back panels) manual Ver. 1 Rev.
1 18. Slide the right edge of the left Back panel (09) all the way behind the Center cover (10) and push the Back panel against the wall. Slide the left edge of the right Back panel (09) all the way behind the Center cover (10) and push the Back panel against the wall as well. You can adjust the position of the Back panels before the sealant sets. Apply equal pressure to the whole surface of the Back panels from top to bottom. 2 See Fig. 23 and Fig. 24 for details. 3 Fig. 23 Fig. 24 Q-Wall 5.
19. Mount the Corner cover (02) to the corner of the shower using the Countersunk screws ST4.2×40 (07). Do not fully tighten the screws at this time; leave them loose for further installation. See Fig. 25 for details 1 2 3 4 Fig. 25 20. Apply the sealant to the entire surface of the reverse side of the Side panel (01). Also, apply the sealant around the drilled holes. See Fig. 26 for details. Fig. 26 Q-Wall 5.2 (w/two back panels) manual Ver. 1 Rev.
21. Slide the narrow edge of the Side panel (01) behind the Corner cover (02). Align trimmed edge of the Side panel (from Step. 9) with the marked line on the wall (in Step. 7) and push the Side panel against the wall. NOTE: Make sure the drilled holes on the Side panel are also aligned with the fixtures on the wall. See Fig. 27 for details. 1 2 Fig. 27 22. Apply sealant to the entire surface of the reverse side of the other Side panel (01). See Fig. 26 for details.
23. Once all panels are aligned, fasten tight the Corner cover (02) to secure the Side panels (01) and Back panels (09). Cover the screw holes with the Decorative covers (08). 1 See Fig. 29 for details. 2 Fig. 29 1 24. Fasten tight the Center cover (10) to secure the Back panels (09). Cover the screw holes with the Decorative covers (08). See Fig. 30 for details. 2 Fig. 30 Q-Wall 5.2 (w/two back panels) manual Ver. 1 Rev.
ATTENTION; Prior to the next step, please be sure the part of the wall for installation of the Decorative edge molding (03) is clean, dry and free from soap, oil and any construction debris. 25. Gently remove the plastic tape from the adhesive side of the Decorative edge molding (03) and firmly press it to the edge of the Side panel (01) from top to bottom. See Fig. 31 for details. 1 Side Panel Wall Decorative Molding 2 Side Panel Wall Decorative Molding Fig. 31 26.
Glass Shelves Installation Instruction 27. Determine the desired height for the Glass shelves (05) and mark the locations on the wall. NOTE: The Glass shelves can be installed either two in one corner, or one in each. See Fig. 33 for details. G H ` Fig. 33 3 1/2" 28. Mark the location for the Shelf brackets (04) according to the measurements in Fig. 28 and Fig. 29.1. Drill the holes using Ø5/16” drill bit and insert the Wall anchors (06). See Fig. 34 for details. 3 1/2" 3 1/2" 1 Ø 5/16" 2 3 Fig.
1 29. Mount the Shelf brackets (04) to the wall using the Countersunk screws ST4.2×40 (07). NOTE: the padded set screw of the Glass bracket should be facing down. Slide the upper Glass shelf (05) into the upper Shelf brackets and tighten the set screws at the bottom of the brackets. Then slide the bottom Glass shelf in place. Tighten the set screws on the bottom Shelf brackets as well. 2 See Fig. 35 and Fig. 36 for details. 3 Fig. 35 Fig. 36 Q-Wall 5.2 (w/two back panels) manual Ver. 1 Rev.
Product maintenance To ensure long lasting life for your acrylic back walls, wipe them off after each use with a soft cloth. To clean the acrylic back walls use non-abrasive sprays or cream based cleaners. Never use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface. Acrylic cleaning procedure: Acrylic should be cleaned with warm water and a clean, non-abrasive cloth. If desired, a mild, non-abrasive detergent may also be used. Use only light pressure when cleaning.
TEL: 866-731-2244 FAX: 866-857-3638 WWW.BATHAUTHORITY.COM For more information on DreamLineTM Shower Back Wall please visit www.BathAuthority.com Q-Wall 5.2 (w/two back panels) manual Ver. 1 Rev.
INFINITY-Z SHOWER DOOR / TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine® reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings, manuals, warranty information or additional details please refer to your model’s web page on DreamLine.
Table of Contents Page # Section title Preparation Tools 2 Parts List 4-5 Installation Steps 6-15 9-10 3 Wall Profiles Wheel Assemblies 12 Vinyl Seals 13 Handle 13 Product maintenance 15 pan el el pan doo r Right-Hand door installation r doo Left-Hand door installation NOTE: This door is reversible for right or left-hand door installation. The right-hand door installation is shown as an example throughout this manual.
Preparation 1. Prior to installation, examine all boxes and packages for shipping damage and compare the piece count with the packing slip. After opening all boxes and packages read this introduction carefully. Check that all of the necessary parts are included in the package by checking off the components on the “Detailed Diagram of Shower Door Components”.
Tools Level Silicone Extender driver bit Tape Measure Pencil Power Drill Phillips Screwdriver Drill bit (Ø=5/16") (Ø=8mm) Drill bit (Ø=1/8") (Ø=3mm) Miter saw or Hacksaw Hammer Metal File Top Tip: Measure the finished opening before Middle Tip: Prior to installation, cover the shower/tub drain with tape to prevent losing screws or small parts. Bottom Tip: Set screw gun clutch to low setting when installing screws and bolts to prevent stripping the heads. W ©2017 DreamLine.
Detailed Diagram of shower door components 2 1 9 13 3 7 8 10 11 12 5 14 4 15 16 18 6 pan el doo r ©2017 DreamLine.
Parts List PART# DESCRIPTION QTY PART# DESCRIPTION QTY Glass profile 2pcs 10 Round head screw ST4.2x25 8pcs 02 Wall profile 2pcs 11 Round head screw ST4.2x10 4pcs 03 Guide rail (top and bottom) 2pcs 12 Flat head screw ST4.
Installation steps 1. Measure the distance between the two finished walls at the top (at model height: 58” or 72”), middle and bottom. The wall profiles will adjust for out-of-plumb conditions, so use the smallest measurement as the “finished opening” dimension to determine the finished cut length in Step #2. (Fig 1) NOTE: The Top and Bottom Guide Rails (#03) are shorter than the model size by design.
3. After the Top and Bottom Guide Rails (#03) have been cut to size, re-install the roller stopper on both of the Top and Bottom Guide Rails (#03) on the end that has been cut off (the door end). 1 Remove the existing stopper. Mark the drilling hole at a distance of 3-1/8” from the cut end of the Top and Bottom Guide Rail (#03). Drill a new hole using a Ø1/8” drill bit; then re-secure the stopper with the screw. (Fig 4) ! ATTENTION: Do Not drill the Guide Rail throughout, only through the first layer.
5. Slide the Wall Profiles (#02) all the way onto the Glass Profiles (#01) on both sides. Note that the holes in the wall profiles are off-center, and should line up with the back side of the frame, in-line with the groove for the panel glass (Fig 6.1). (Fig 6) 2 1 3 Inside of shower Fig 6 ! *NOTE: At this step you can reverse the handing of the installation by flipping the assembly top to bottom so that the panel glass installs on the opposite side.
! TIP: Before installing the frame assembly, bring the Door Glass (#04) into the shower area and lean it safely against the wall, using padding to protect the glass, walls and base. Be sure the handle holes on the Door Glass (#04) are on the correct side for installation. The wheel assemblies can be attached prior to setting the glass into the shower. (see Step#11) ©2017 DreamLine. All Rights Reserved Padding Fig 8 ! NOTE: DO NOT install the towel bar or handle onto the glass until instructed to do so.
7. Use an assistant to hold the assembly in position and mark the holes for drilling on the wall through the holes in the Glass Profiles (#01) and the Wall Profiles (#02). Gently set the assembled unit aside; drill the holes using a Ø5/16” drill bit and insert the Wall Anchors (#14). (Fig 9) 2 1 3 Ø5/16" Fig 9 8. Apply silicone caulk to the rear surface of the Wall Profiles (#02) and around the holes on the wall. Also apply silicone caulk under the Bottom Guide Rail (#03).
9. Slide the Stationary Glass (#05) fully into the groove of the Glass Profile (#01) and then secure the Glass Holders (#16) to the Top and Bottom Guide Rails (#03) with the Flat Head Screws ST4.2x16 (#12). (Fig 11) ! NOTE: Use caution when installing the stationary glass into the frame to prevent damage to the edges of the glass.
11. Fasten the top and the bottom Wheel Assemblies (#17) to the Door Glass (#04). All wheels should be installed to face the outside of the shower. The door can be adjusted using the adjustable bolt on the top wheels (Fig. #13.4). The push-button on the bottom wheel should point up, and can be pressed to release the spring-loaded bottom wheel to assist in installation into the Bottom Guide Rail (#03). Be sure the handle holes are on the correct side for the installation.
13. Starting from the bottom, insert the Single Side Strip (#08) into the groove between the Stationary Glass (#05) and the glass profile using a wooden or plastic shim. The strip should be inserted from the inside of the shower. (Fig 15) ATTENTION: To prevent scratching or damaging the glass and aluminum: Do Not use a screwdriver or other metal object to install the Single Side Strip (#08) ! inside inside Fig 15 14. Install the Handle (#06) to the Door Glass (#04).
15. Perform the final adjustment of the assembled unit within the Wall Profiles (#02) making sure the bottom rail is tight to the threshold. Drill Ø1/8”holes in the center of the Wall Profile (#02) into the Glass Profile (#01). Drill one hole at the top and one hole at the bottom of each profile. Secure the Wall Profile (#02) to the Glass Profile (#01) using the Round Head Screws ST4.2x10 (#11) and raised white washers.
16. Apply a good quality mildew-resitant silicone around the interior perimeter along both wall profiles and the bottom rail on the threshold. (Fig 18) ! Allow 24 hours for the silicone to cure before using the shower. ©2017 DreamLine.
Product Maintenance BASES and BACKWALLS: To ensure long-lasting life for your acrylic back walls, wipe them off after each use with a soft cloth. To clean the acrylic back walls use non-abrasive sprays or cream based cleaners. Avoid the use of aerosol spray cleaners. Never use abrasive cleansers, metal brushes or scrapers that could scratch or dull the surface. GLASS: To ensure long-lasting life for your glass shower products, wipe them off after each use with a soft cloth.
TEL: 866-731-2244 FAX: 866-857-3638 DREAMLINE.COM For more information on DreamLine® Shower Doors and Enclosures please visit DreamLine.com ©2017 DreamLine.