Installation Guide
Table Of Contents

Ver. 1, Rev. 1
16
ATTENTION;
Prior to the next step, please be sure the part of
the wall for installation of the Decorative edge
molding (03) is clean, dry and free from soap, oil
and any construction debris.
22. Gently remove the plastic tape from the adhesive side
of the Decorative edge molding (03) and firmly
press it to the edge of the Side panel (01) from top to
bottom.
See Fig. 25 for details.
Fig. 25
23. Apply caulk along the top edges of the Side
panels (01) and the Back panels (09).
Apply caulk along the connection of the
bottom edges of the Side panels and
bottom edges of the Back panels with the
Shower base.
See Fig. 26 for details.
ATTENTION:
Installation of your “QWALL-5” Acrylic
shower wall is complete.
If you want to install Glass shelves (05) to
your Shower, follow to the next step.
Fig. 26
1
2
Side Panel
Wall
Molding
Decorative
Side Panel
Wall
Molding
Decorative