Installation Guide
Q-Wall 5.2 (w/two back panels) manual Ver. 1 Rev. 2 08/2015 
19 
ATTENTION;  
Prior to the next step, please be sure the part of the 
wall for installation of the Decorative edge molding 
(03) is clean, dry and free from soap, oil and any 
construction debris. 
25. Gently remove the plastic tape from the adhesive side 
of the Decorative edge molding (03) and firmly press 
it to the edge of the Side panel (01) from top to 
bottom. 
See Fig. 31 for details. 
      Fig. 31 
26. Apply caulk along the top edges of 
the Side panels (01) and the Back 
panels (09). 
Apply caulk along the connection of 
the bottom edges of the Side 
panels  and  bottom edges of the 
Back panels with the Shower base. 
See Fig. 32 for details. 
ATTENTION: 
Installation of your “QWALL-5” 
Acrylic shower wall is complete. 
If you want to install Glass shelves 
(05)  to your Shower, follow to the 
next step. 
    Fig. 32 
1
2
Side Panel
Wall 
Molding
Decorative
Side Panel
Wall 
Molding
Decorative










