Installation Guide
             ©2018 DreamLine. All Rights Reserved 
SLIMLINE SHOWER BASE manual Ver 5 Rev 9  03/2018 
2 
Preparation 
1.  Prior  to  installation,  examine  all  boxes  and  packages  for  shipping  damage  and  compare  the 
piece count with your packing slip. After opening all boxes and packages read this introduction 
carefully. Check that  all of the needed parts  are included in the package  by  checking  off the 
components  on  the  “Detailed  Diagram  of  Shower  Door  Components”.  If  the  unit  has  been 
damaged,  has  a  finishing  defect,  or  has  missing  parts,  please  contact  our  customer  support 
department within 3 business days of the delivery date. Please note that DreamLine
®
 will not 
replace any damaged products or missing parts free of charge after 3 business days or if 
the  product  has  been  installed.  Please  contact  DreamLine
®
  if  you  have any  questions  and 
please  provide  an  order  number,  job  name  or  other  proof  of  purchase  to  help  identify  the 
original order. 
2.  Install  all  of  the  required  plumbing  and  drainage  before  installing  the  shower  base.  Use  a 
competent and licensed (if required by local code) plumber for all plumbing installation. 
3.  Shower  bases must  be installed by  a licensed  plumber. Please  note  that you should 
consult  your  local  building  codes  with  questions  on  installation  compliance  standards. 
Building and plumbing codes may vary by location and DreamLine
®
 is not responsible for 
code compliance standards for your project. 
4.  Make sure that prior to the installation the installation surface is leveled and solid and will be 
able to support the total weight of the unit. Also make sure the walls are at right angles. While 
some adjustment  in  leveling of  the  tray is  possible, irregular  installation surface  level or 
improper  angle  of  side  walls  will  result in  serious  problems for  your  installation. Please  note 
that some adjustments may be necessary during the installation process. 
5.  Center drain configurations are centered on the width only. See technical drawing tables 
for drain locations. 
6.  Drain not included with this product. The drain 
opening
 is 3-3/8” in diameter and accepts a 
standard 2” compression fitted drain. 
IMPORTANT NOTE: 
Dimensions  provided  are  for  reference  only.  Measure  the  actual  shower  tray 
before  installation.  This  includes  overall  dimensions  and  drain  location. 
Allowed tolerance for center of the drain is +/-1/2". 
Tools Required 
XXX
Tape 
Measure 
Pencil 
Level 
Mortar 










