Operation Manual
VigorSwitch P2280 User’s Guide
152
between 1 day and 31 days. For example, 7 means the whole
cycle is 7 days; 20 means the whole cycle is 20 days. When the
time is up, the PoE device will be turned on of off
automatically.
Apply Apply the settings to the switch.
V
V
I
I
-
-
4
4
-
-
2
2
P
P
o
o
r
r
t
t
S
S
c
c
h
h
e
e
d
d
u
u
l
l
i
i
n
n
g
g
This page allows the network administrator to specify the PoE port for applying the schedule.
The configuration result for each port will be displayed on the table listed on the lower side
of this web page.
Available settings are explained as follows:
Item Description
Ports Select the port or ports for applying the schedule.
Schedule Index Use the drop down list to choose the schedule profile (from 1
to 15). After clicking Apply, the selected port(s) will be
applied with the specified schedule.
Apply Apply the settings to the switch.