Operation Manual
VigorSwitch P1280 User’s Guide
78
point.
Cycle duration (days) - The period of cycle duration is
between 1 day and 31 days. For example, 7 means the whole
cycle is 7 days; 20 means the whole cycle is 20 days. When the
time is up, the PoE device will be turned on of off
automatically.
Apply Save the settings or changes to the switch.
V
V
-
-
4
4
-
-
2
2
P
P
o
o
r
r
t
t
S
S
c
c
h
h
e
e
d
d
u
u
l
l
i
i
n
n
g
g
This page is used to specify the PoE port for applying the schedule. The configuration result
for each port will be displayed on the table listed on the lower side of this web page.
Available settings are explained as follows:
Item Description
Ports Select the port or ports for applying the schedule.
Schedule Index Use the drop down list to choose the schedule profile (from 1
to 15). After clicking Apply, the selected port(s) will be
applied with the specified schedule.
Apply Save the settings or changes to the switch.