Installation guide

114
VLAN to expand the network. So, we defined four VLANs that are VLAN5, VLAN6,
VLAN7 and VLAN8, each LAN port is Trunk port which supports multiple VLAN, the
subnet of VLAN5 is 192.168.1.0, the subnet of VLAN6 is 192.168.2.0, the subnet of
VLAN7 is 192.168.3.0, and the subnet of VLAN8 is 192.168.4.0.
Figure 5-20. Application 5
Configuration:
1. Block LAN-to-LAN communication.
2. Create VLAN5, VLAN6, VLAN7 and VLAN8 Groups.
3. In the VLAN5, input “5” to VLAN ID. In the Member field, choose p1, p2, p3 and
p4. Then choose the “Tagged” for Frame Tag Operation in p1, p2, p3 and p4. We
can ignore the PVID (Port VLAN ID), because 802.1q tag will be inserted to the
frame from the switch.
4. In the VLAN6, input “6” to VLAN ID. In the Member field, choose p1, p2, p3 and
p4. Then choose the “Tagged” for Frame Tag Operation in p1, p2, p3 and p4. We
can ignore the PVID (Port VLAN ID), because 802.1q tag will be inserted to the
frame from switch.
5. In the VLAN7, input “7” to VLAN ID. In the Member field, choose p1, p2, p3 and
p4. Then choose the “Tagged” for Frame Tag Operation in p1, p2, p3 and p4. We
can ignore the PVID (Port VLAN ID), because 802.1q tag will be inserted to the
frame from the switch.
6. In the VLAN8, input “8” to VLAN ID. In the Member field, choose p1, p2, p3 and
p4. Then choose the “Tagged” for Frame Tag Operation in p1, p2, p3 and p4. We
can ignore the PVID (Port VLAN ID), because 802.1q tag will be inserted to the
frame from some users.
7. After applying the settings, the web page will be redirected to “reboot” web page.
User can ignore it and continue to configure the Network setting. After Network
setting, then you can do the reboot procedure.