Installation guide
109
Figure 5-12. Application 2
Configuration:
1. Block LAN-to-LAN communication.
2. Create VLAN5 and VLAN6 Groups.
3. In the VLAN5, input “5” to VLAN ID. In the Member field, choose p1 and p2.
Then choose the “Tagged” for Frame Tag Operation in p1 and p2. We can ignore
the PVID (Port VLAN ID), because 802.1q tag will be inserted to the frame from
the PC of Engineer Department.
4. In the VLAN6, input “6” to VLAN ID. In the Member field, choose p3 and p4.
Then choose the “Tagged” for Frame Tag Operation in p3 and p4. We can ignore
the PVID (Port VLAN ID), because 802.1q tag will be inserted to the frame from
other departments.
5. After applying the settings, the web page will be redirected to “reboot” web page.
User can ignore it and continue to configure the Network setting. After Network
setting, then you can do the reboot procedure.
Note After rebooting, the tagged ports will only communicate with 802.1Q tagged
devices.