Specifications

D-1000B Heater Operations & Maintenance
MAINTENANCE, and REPAIR PROCEDURES 5-6 DHS SYSTEMS LLC
No rights are conveyed except as indicated in the legend on the inside front cover of this document.
5.4.3 Removal and Installation of the Condenser (Capacitor)
5.4.3.1 Removal procedures:
1. Disconnect power cord from the power source. Allow heater to cool.
2. Using an 8mm nut driver, remove two middle screws from the maintenance access panel (7) and loosen four
corner screws (78).
3. Slide maintenance access panel (7) rearward.
4. Slide the plastic cover off the capacitor (11) and disconnect two female terminal couplers as shown in Figure 5-3.
5. Using a 13mm socket wrench, loosen and remove the nut and lock washer.
6. Remove capacitor (11) from electric motor (10).
5.4.3.2 Installation procedures:
1. Install capacitor (11) onto the electric motor (10).
2. Using a 13mm socket wrench, install lock washer and nut. Tighten hardware.
3. Reconnect the two female terminal couplers and slide plastic cover over terminals.
4. Slide maintenance access panel (7) forward.
5. Using an 8mm nut driver, install two middle screws (78) and tighten all remaining hardware.
6. Test heater in accordance with operations manual. (See Chapter 6).