Operating instructions
Copyright © 2000, Draper, Inc. Form ECLi00 Printed in U.S.A.
Installation/Operating Instructions
Eclipse/V & H Screen Masking System by Draper
411 S. Pearl St., Spiceland, IN 47385 USA
❚
765-987-7999
❚
fax 765-987-7142
e-mail draper@draperinc.com ❚ www.draperinc.com
Planning
Through these instructions, your Eclipse will be assembled on the floor, face
down, then lifted into place around the screen and attached to the wall. The
drawing at right shows the positional relationship between the screen and the
Eclipse. Plan carefully where the screen is to be placed.
Determine now how the motor’s power cord is to be routed once the unit is
lifted into place (motor will be at viewer’s upper right), how the unit is to be
controlled, and where the control switch (es), if any, will be located. Refer
ahead to the
Electrical Connections
section, the
Operation
section, and the
last page of wiring diagrams for more specific information on control options
and their wiring requirements. Make the necessary arrangements for this now.
Limit switch adjusters are located through the top of the head box, near the
right end. Bear in mind that recessing the Eclipse into a wall or between
cabinets or shelves without adequate surrounding space will render these
adjusters inaccessible, and is not recommended.
Screen Installation
Follow the instructions for mounting the screen first.
–Clarions include assembly instructions and mount with Z-Clips;
–Cineperm frames also include assembly instructions, and are simply
drilled through and screwed to the wall.
Note—Both models, Clarion and Cineperm, are spaced away from the wall
using six 1
1
/
8
" wood spacers included with the Eclipse: 2 for both top and
bottom; 1 at each side. Refer to the drawing at right.
Mounting feet
shown INWARD
Clarion or Cineperm frame
spaced out from wall 1
1
/
8
"
1
1
/
8
" wood spacers
six places
AB
Clarion 1" 4¼"
ShadowBox 1¼"4½"
Cineperm ¾"4"
Side covers
Screen frame width
Frame width + 2A
to INSIDE of side rails
Side cover length = frame height + 2B
Screen frame height
B
B
A
A
Operation
When Eclipse is first operated, be cautious! Cycle up and down several times
to confirm satisfactory operation.
115V SINGLE STATION CONTROL — 3-position UP–OFF–DOWN switch
permits operation to be stopped at any point. Factory adjusted limit switches
automatically stop Eclipse when fully up or fully down.
LOW VOLTAGE CONTROL — Three-button UP–STOP–DOWN switches stop
at any point desired and operate in any sequence. Factory adjusted limit
switches automatically stop Eclipse when fully up or fully down.
VIDEO INTERFACE CONTROL — Allows Eclipse to be controlled by a trigger
signal—when the signal comes on, the Eclipse descends automatically. Three
versions: Model VIC-115 integrates Eclipse operation with a DRAPER video
projector lift or a video projector or tuner with a 115V switched outlet. Models
VIC-12 and VIC-6 interface with 12V and 6V switched outlets respectively. All
three are available with an override switch (VIC–OS), permitting independent
operation.
KEY OPERATED SWITCHING — A three-position key switch permits the
screen to be operated directly by key. In this case, the screen’s operator must
always have a key.
Electrical Connections
Motor operates on 115 VAC, 60 Hz. current. Motor is located at the right end of
the upper head box. Motor pigtail consists of red, black, white, and green wire
leads, per attached wiring diagram. Wall electrical box should be installed so
as to be fully concealed by head box after installation. Eclipse is shipped with
control switch (es) fully boxed.
Wire to connect screen to switch (es) and switch (es) to power supply should
be furnished by installer. Connections should be made in accordance with
attached wiring diagram, and wiring should comply with national and local
electrical codes.
All operating switches should be “off” before power is connected.
Caution
➀ Read instructions thoroughly before proceeding; keep them for future
reference. Follow instructions carefully. Installation contrary to instruc-
tions invalidates warranty. Care in both mounting and correct operation
will mean long and satisfactory service from your Draper Eclipse Screen
Masking System.
➁ Eclipse should be accessible for complete removal should fabric
become damaged or should other service be required.
➂ Eclipse should be installed so horizontal members are level, vertical
members are plumb, and corners are square.
➃ Nothing should be fastened to the Eclipse’s hardware or fabric.
➄ Operating switch (es) packed separately in carton. Do not discard with
packing material.
➅ Motor operates on 115 VAC, 60 hz. current.
NOTE: Unit has been assembled, tested, and thoroughly inspected at
factory prior to being disassembled for shipment.
Adjustments
➀ Adjust limit switches so the masking can be completely
drawn or retracted without the bottom edge going
beyond the fabric retention guides located at the
upper end of each side channel.
A. Fully depress both limit switch push buttons, then
operate switch to make sure system works properly.
B. Raise to desired “up” stop position.
C. Set upper limit by depressing and releasing the
proper push button.
D. Lower to desired “down” stop position.
E. Set lower limit by depressing and releasing the
proper push button.
NOTE: Be sure all switches are in “off” position before adjusting limit
switches. At no time should masking be unrolled enough to expose any
part of roller.
Push
Buttons