Installation Guide

Before installation
8
When the equipment is installed in regions where the temperature falls below zero degree Celsius
during the winter, ice can accumulate on the installation tower structure. Take precautions to
avoid the breakage of antennas due to falling ice. Suitable protection can be achieved, by install-
ing a metal grating above the antenna.
2.2 Needed parts
Before starting the installation, verify that you have the correct equipment and that the equipment
has not been damaged during transportation.
The following parts are needed in the normal installation of the equipment:
1 X LITE equipment;
FIGURE 1. LITE appearance (with internal antenna)
For more information on the physical design of the equipment, refer to Volume 1, Chapter 4
Mechanical structure and interfaces.
2 x pre-assembled outdoor Ethernet cables (length options: 1 m, 2 m, 5 m, 10 m, 30 m, 50 m, 70
m, 90 m);
1 x grounding cable;
223.1 mm
217.87 mm
190.14 mm
88.30 mm
With 190x190 mm
Internal Antenna
8.4 mm
8.4 mm
86 mm
66 mm
With External Antenna