Operations Manual

.223 CALIBER
ASSEMBLY
19
10. Slide in bolt carrier group.
11. Push in charging handle and bolt carrier
group together.
12. Join upper and lower receivers.
13. Engage receiver pivot pin.
BE SURE BOLT IS
STILL UNLOCKED
9. Engage, then push
charging handle part way.
14. Close upper and lower receiver
groups. Push in takedown pin.
15. Put handguards
in place.
16. Snap on sling.
HOLD DELTA
RING DOWN
RELEASE
DELTA RING
CHECK FOR FULL
ENGAGEMENT
CAUTION
Selector lever must be on
safe before closing
upper receiver.
CHECK THE
selector lever
BY PERFORMING THE
FUNCTIONAL CHECK
SEE PAGE 6.
IS EVERYTHING
INSTALLED?