Installation & Assembly
PARTS LIST
Your 5-Tier Square Rack should include the following parts. Please inspect box contents to ensure you
have received all components.
You will NOT need additional tools for assembly.
1
SIDEBAR W/
HOOKS (1)
E
A B
SHELF (3)
C
TOP POLE (4)
End Cap (4) and
Pole Connector (4)
pre-installed
BOTTOM POLE (4)
Threaded Insert (4)
pre-installed
D F
Note: The black circular plastic spacers in between Shelves are used only for packaging
purposes. They are NOT needed. Please discard.
ANTI-TIP
HARDWARE PACK
(1)
G H I J
WRENCH (1)LOCKING
CASTER (4)
MIDDLE POLE (4)
Pole Connector (4)
pre-installed
BASKET (2)
SLIP SLEEVE
(42) + (4) extra